Post by Sir Henry »

So what's up with the second wave mech/sequenced arriving unsequenced? Some stunning feat of shitcockery from higher up no doubt...
"A third of the world's farmland is now useless due to soil degradation, yet we still keep producing mouths to feed. And what's you answer to that? Energy saving lightbulbs?"
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12098
Joined: 12 Nov 2008, 17:03
Gender: Male

Team Valley Gateshead MC

Post by SpacePhoenix »

Probably either most DOs want their wave 2 in a lot earlier or the local MC might have had their budget cut back
Steve_claret
MAIL CENTRES/PROCESSING
Posts: 324
Joined: 17 Dec 2011, 14:53
Gender: Male

Team Valley Gateshead MC

Post by Steve_claret »

Walksorting Wave 2 is soon to be the norm. Declining letter volumes is the standard excuse.
Binsey
Posts: 390
Joined: 14 Aug 2015, 17:33
Gender: Male

Team Valley Gateshead MC

Post by Binsey »

Plus a fair few CSS Machines nationally are to be mothballed.

Big changes on the Mech imminent.
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12098
Joined: 12 Nov 2008, 17:03
Gender: Male

Team Valley Gateshead MC

Post by SpacePhoenix »

Binsey wrote:Plus a fair few CSS Machines nationally are to be mothballed.

Big changes on the Mech imminent.
Some batches to be done on IMPs/iLSMs instead of on CSS machines? Some batches to be walk sorted only both waves?
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12098
Joined: 12 Nov 2008, 17:03
Gender: Male

Team Valley Gateshead MC

Post by SpacePhoenix »

Is it known if any of the CSS machines to be mothballed are in MCs?
Binsey
Posts: 390
Joined: 14 Aug 2015, 17:33
Gender: Male

Team Valley Gateshead MC

Post by Binsey »

SpacePhoenix wrote:Is it known if any of the CSS machines to be mothballed are in MCs?


All gone quiet I know it's at Stage 3 disagreement and has gone national.
Steve_claret
MAIL CENTRES/PROCESSING
Posts: 324
Joined: 17 Dec 2011, 14:53
Gender: Male

Team Valley Gateshead MC

Post by Steve_claret »

SpacePhoenix wrote:Is it known if any of the CSS machines to be mothballed are in MCs?
Highly doubt it. Won't the MC's be asked to do more sequencing once delivery MPU's are reverted back to plain old DO's again?
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12098
Joined: 12 Nov 2008, 17:03
Gender: Male

Team Valley Gateshead MC

Post by SpacePhoenix »

Steve_claret wrote:
SpacePhoenix wrote:Is it known if any of the CSS machines to be mothballed are in MCs?
Highly doubt it. Won't the MC's be asked to do more sequencing once delivery MPU's are reverted back to plain old DO's again?
Probably. Though some DOs will get their mech mail later
Steve_claret
MAIL CENTRES/PROCESSING
Posts: 324
Joined: 17 Dec 2011, 14:53
Gender: Male

Team Valley Gateshead MC

Post by Steve_claret »

SpacePhoenix wrote:
Steve_claret wrote:
SpacePhoenix wrote:Is it known if any of the CSS machines to be mothballed are in MCs?
Highly doubt it. Won't the MC's be asked to do more sequencing once delivery MPU's are reverted back to plain old DO's again?
Probably. Though some DOs will get their mech mail later
Won't matter as we are a parcels business now. :wink: