dvbuk55 wrote:Surely everyone is due a non sequenced revision NOW to incorporate the increased workload due to D2D, the HCTs, the CDVs, presumably to save full time jobs, and a sequenced revision when the machines are up and running for their office otherwise when are they going to get the non-sequenced lump sum? There seems to still be a lot of loose ends ipso facto the agreement wouldn't you say? - on reflection YOU probably wouldn't say.dingo wrote:Look the guidelines have now been agreed and will be sent to Divisonal reps today, so all will be revealed. The control change document will also confirm that all other guidelines or briefs are now withdrawn.
With regards local workshop brief has now been agreed along with the geo route video. Divisonal reps will meet with their regional counterparts next week to confrim the roll out. The roll out of the workshops will depend on when your office is due a revision.
dvbuk
My D.O is getting a non sequenced revision at some point before April 2011, but delivery methods revision is to be done at the same time as sequenced mail revision in 2012 (been some slippage on the date of machines going in at the MC), that is the same for some other D.O's in my postcode area/regional area. So we will have the extra DTD but not Delivery methods
Now I must say tr ra chuck as im off my hols for a week to spend my £300 CS money