ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
Flat sorting machines.
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32728
- Joined: 07 Aug 2006, 03:19
- Gender: Male
Flat sorting machines.
Any of theses feckers working anywhere?
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
johnnyp
- Posts: 5239
- Joined: 27 Jan 2007, 16:00
- Gender: Male
- Location: SE ENGLAND
Re: Flat sorting machines.
I think theres 1 in 9 Elms mate,cost £4Million,spent £4 training Romec how to fix it when it breaks down alotPOSTMAN wrote:Any of theses feckers working anywhere?
Last i heard it was only sorting work for SW1 and SE1 offices.
-
TrueBlueTerrier
- FORUM ADMINISTRATOR
- Posts: 72604
- Joined: 30 Dec 2006, 10:29
- Gender: Male
- Location: On my couch
Re: Flat sorting machines.
That explains a few thingsjohnnyp wrote: spent £4 training Romec how to fix it when it breaks down a lot
All post by me in Green are Admin Posts.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
-
DGP1
- Posts: 15551
- Joined: 07 Jun 2007, 20:39
- Gender: Male
- Location: Terminus
Re: Flat sorting machines.
We're supposed to have one over here but I've never seen any evidence of it.
I'm afraid that it must be one of those urban legends like managers with backbone or traffic wardens with a heart or doctors without an ego
I'm afraid that it must be one of those urban legends like managers with backbone or traffic wardens with a heart or doctors without an ego
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
-
vinster
- MAIL CENTRES/PROCESSING
- Posts: 8
- Joined: 22 Oct 2007, 17:17
Re: Flat sorting machines.
We have one installed in our Mail Centre.
Operators are being trained shift by shift at the moment.
ROMEC are the contractors who install these machines while Royal Mail Engineers (RME) are the ones who maintain and fix them when they breakdown. These are totally different engineers.
Seems to be working very well so far and have been told it can sort 40,000 flat items per hour.
Several people in the office have taken an EVR package as manual duties are lost to this machine.
Operators are being trained shift by shift at the moment.
ROMEC are the contractors who install these machines while Royal Mail Engineers (RME) are the ones who maintain and fix them when they breakdown. These are totally different engineers.
Seems to be working very well so far and have been told it can sort 40,000 flat items per hour.
Several people in the office have taken an EVR package as manual duties are lost to this machine.
-
springs
- MAIL CENTRES/PROCESSING
- Posts: 38
- Joined: 10 Oct 2007, 17:26
Re: Flat sorting machines.
we have a tops 2000 flat sorting machine installed at mount pleasant
-
thehappyones
- MAIL CENTRES/PROCESSING
- Posts: 305
- Joined: 08 Nov 2007, 11:42
- Gender: Male
Re: Flat sorting machines.
We had a flat sorter ,got rid of now we have the big cow (t2k)
The only reason people get lost in thought is because it's unfamiliar territory.
-
theflyingpostman
- Posts: 136
- Joined: 02 Jul 2007, 23:03
- Gender: Male
- Location: The Home Counties
Re: Flat sorting machines.
Interesting videos on YouTube:
http://www.youtube.com/watch?v=CLliUjc8ug4
http://www.youtube.com/watch?v=2xzHw2b0 ... re=related

http://www.youtube.com/watch?v=CLliUjc8ug4
http://www.youtube.com/watch?v=2xzHw2b0 ... re=related
-
axeman
- Posts: 1733
- Joined: 12 Jun 2007, 17:57
Re: Flat sorting machines.
fine for the first few months but as the bearings wear out and then the failures start machines are laid up whilst the engineers repair them ...and theres a whole lot of bearings and motors in there to fail (but some might say there infalable
) and as these move at rather more 'pace' than a conveyer system 'alla car plant' a lot can and will go wrong no backup as theres a space problem and they are after all rather large of course as the wear takes place how accurate will they be after a few 'miles'
-
Tman
- Posts: 4134
- Joined: 21 Oct 2007, 09:57
Re: Flat sorting machines.
As accurate as they are after 0 "miles", is the obvious answer.
Spares aren't a problem anyway, as all this automation reduces to easily stockable and repairable sub-assemblies, and as for "pace", RM has used high-speed processing equipment for years.
Any other problems you think those designers didn't consider... ?:hmmmm
Spares aren't a problem anyway, as all this automation reduces to easily stockable and repairable sub-assemblies, and as for "pace", RM has used high-speed processing equipment for years.
Any other problems you think those designers didn't consider... ?:hmmmm
-
baldrick
- EX ROYAL MAIL
- Posts: 5038
- Joined: 13 Sep 2007, 23:37
- Gender: Male
Re: Flat sorting machines.
Possibly the six hours it can take to get the spare part or toolTman wrote:Any other problems you think those designers didn't consider... ?:hmmmm
from Gatwick to London when a Tops 2000 breaks down.
-
Tman
- Posts: 4134
- Joined: 21 Oct 2007, 09:57
Re: Flat sorting machines.
RME at Swindon organise a nation-wide courier service for vital parts if needed. Six hours to Gatwick? What did they use, a postie on a bike?
-
baldrick
- EX ROYAL MAIL
- Posts: 5038
- Joined: 13 Sep 2007, 23:37
- Gender: Male
Re: Flat sorting machines.
Nah - probably a 'skilled' engineerTman wrote:RME at Swindon organise a nation-wide courier service for vital parts if needed. Six hours to Gatwick? What did they use, a postie on a bike?
Actually it only took three hours to get the tool, then another three hours
with half a dozen engineers gathered round a screen, scratching their heads.
-
Tman
- Posts: 4134
- Joined: 21 Oct 2007, 09:57
Re: Flat sorting machines.
That's terrible........ normally string 'em out for much longer than three hours...... 
-
axeman
- Posts: 1733
- Joined: 12 Jun 2007, 17:57
Re: Flat sorting machines.
Come on teaman get real the accuracy has to be in question after a period in the workplace and after a few spaner monkeys have been let loose you only have to look at present equipment as to the accuracy obtainable and it's mostly down to maintance schedule (lack off) let be honest royal fail will only repair it when it fails to costly to do it correctly just look at our vans and equipment around the office 