Post by LaggyBand »

Maybe it’ll become a term of the service contract that if a letter is not in a format compatible with the sorting technology then it gets sent back or burnt.
posted
Posts: 255
Joined: 31 Jan 2018, 20:21
Gender: Male

Re: Unagreed trial into a frameless office

Post by posted »

I don’t know how it would work but I had seen the the old bench merging videos. Would like to think it’s vastly improved, whatever the solution is.

Stepping away from the dispute and current trial for a moment, you can see that RM2000 frames are not going to be fit for purpose in the future.

1st of all we currently put sequenced mail into a frame, then taking out again. That’s all worked fine, for now.
But where is the future heading?
Letters are declining.
We’re mechanising a higher proportion of what’s left.
Delivery rounds are getting bigger, at best I’ve seen 2 frames + 2 wings for one delivery.

If letter volumes continue to drop as they say they will then we’ll be covering a larger geographical area but lower call rate. That’s when frames become inefficient use of time and floor space. Would need a solution then. We’re definitely not at that point, yet.

Would letter volumes need to drop to such extent that it gets treated like a barcoded parcel?
I.e you just know where it goes on your delivery, put it in a small pouch or scan it into to your RON app manifest.
Dexydog
Posts: 887
Joined: 14 Jan 2017, 13:54
Gender: Male

Re: Unagreed trial into a frameless office

Post by Dexydog »

Why not just go back to the 64 box frames and have, say, 15 calls per box?
It worked just fine back in the day when sometimes each box was crammed full.
We still managed to get out in good time.
Then again, the incentive was there.
For the newer bods, this system meant you had to have arms and fingers like an octopus to prep each box of calls in order from top left to bottom right.
In those days those boxes would get seriously full.
posted
Posts: 255
Joined: 31 Jan 2018, 20:21
Gender: Male

Re: Unagreed trial into a frameless office

Post by posted »

Dexydog wrote:
13 Nov 2022, 21:49
Why not just go back to the 64 box frames and have, say, 15 calls per box?
It worked just fine back in the day when sometimes each box was crammed full.
We still managed to get out in good time.
Then again, the incentive was there.
For the newer bods, this system meant you had to have arms and fingers like an octopus to prep each box of calls in order from top left to bottom right.
In those days those boxes would get seriously full.
Perhaps that should be first step before going frameless, whilst IPS is still a thing
Hyrrokkin
Posts: 873
Joined: 24 Nov 2021, 18:17
Gender: Male

Re: Unagreed trial into a frameless office

Post by Hyrrokkin »

I thought all this bench merging was a wind up bullshit practical joke

The more i read the more i am warming to this latest genius idea from our Lord and Masters

Bring it on i say...bring it on

The chaos,anger,fighting and general shitaboutery this will bring will be EPIC
Every day will be a bombsite
I will follow it to a tee and laugh my ass off at this disaster

RM Trust us we will f**k it up for you everytime anytime
Hyrrokkin
Posts: 873
Joined: 24 Nov 2021, 18:17
Gender: Male

Re: Unagreed trial into a frameless office

Post by Hyrrokkin »

ted_e_bear wrote:
13 Nov 2022, 19:37
Dexydog wrote:
13 Nov 2022, 18:38
Straddle the bog with the lid down.
Use the cistern as your bench.
Excellent idea, I'll be leaving the lid up though so I can save RM a bit of time by shiteing whilst working :Very Happy
Better watch the screw and his stormtroopers will knock the door down and ask why you are not moving !!
HTPostman
EX ROYAL MAIL
Posts: 1505
Joined: 01 Sep 2008, 23:53
Gender: Male

Re: Unagreed trial into a frameless office

Post by HTPostman »

Hyrrokkin wrote:
13 Nov 2022, 22:49
I thought all this bench merging was a wind up bullshit practical joke

The more i read the more i am warming to this latest genius idea from our Lord and Masters

Bring it on i say...bring it on

The chaos,anger,fighting and general shitaboutery this will bring will be EPIC
Every day will be a bombsite
I will follow it to a tee and laugh my ass off at this disaster

RM Trust us we will f**k it up for you everytime anytime
Snap.

Just imagine when there’s 3 or 4 days worth of letters because the round hasn’t been covered. Trying to bench merge all 4 boxes of letters with flats, small parcels, D2Ds etc. I probably wouldn’t leave the office while midday ‘so which 1 of the 7 loops do you want me to take, boss.’

I hope we all do it as instructed, I’ll give it a week until managers are shaking their heads and digging out smashed up frames from the skip....they could fix them back together with rubber bands and duct tape just like the vans.
The day is gonna come when we’re all gonna have to testify.

526
roman
Posts: 265
Joined: 15 Jun 2020, 20:19
Gender: Male

Re: Unagreed trial into a frameless office

Post by roman »

If you have to rely on the mech mail being in correct order it won’t happen. You normally get a mixture of letters at the end of the box plus Missorts from other rounds. The letters come upside down and back to front it will be a nightmare when your out there delivering.
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12163
Joined: 12 Nov 2008, 17:03
Gender: Male

Re: Unagreed trial into a frameless office

Post by SpacePhoenix »

roman wrote:
14 Nov 2022, 09:25
You normally get a mixture of letters at the end of the box plus Missorts from other rounds.
The letters at the end are where the machine has enough info to sort it to a walk, but not enough info as to where in the walk it goes, probably incomplete or missing entries on Route Planner.
roman wrote:
14 Nov 2022, 09:25
The letters come upside down and back to front it will be a nightmare when your out there delivering.
Upside down ones will have been put through the initial IMP or iLSM upside down. If they are put the right way up, a CSS machine will reject them as it won't find the orange barcodes where it expects to find them on the letter. Sometimes mail might get put through upside down where it is prone to jamming right way up. Are the back to front ones RTS items with the return address on the back?
Dexydog
Posts: 887
Joined: 14 Jan 2017, 13:54
Gender: Male

Re: Unagreed trial into a frameless office

Post by Dexydog »

Oh for Chist's does it matter WHY they're upside down, back to front, or missorts?.
The fact is they'll always be there which will cause the front line problems.
In the end that's the only thing that matters when we're talking about final mile delivery and a new cock eyed way of prepping it.
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12163
Joined: 12 Nov 2008, 17:03
Gender: Male

Re: Unagreed trial into a frameless office

Post by SpacePhoenix »

Dexydog wrote:
14 Nov 2022, 10:06
Oh for Chist's does it matter WHY they're upside down, back to front, or missorts?.
The fact is they'll always be there which will cause the front line problems.
In the end that's the only thing that matters when we're talking about final mile delivery and a new cock eyed way of prepping it.
Some of the problems can be eliminated by the nominated person at a DO making sure that all the entries in Route Planner are always fully up to date, which would mean a greater % of the mail would arrive in the DOs sequenced.

Given that the DO I know of locally has already had their prep frames removed, my git feeling is that this time around, bench merging might be here to stay.
Acca Dacca
Posts: 3219
Joined: 16 Aug 2009, 17:13
Gender: Male

Re: Unagreed trial into a frameless office

Post by Acca Dacca »

SpacePhoenix wrote:
14 Nov 2022, 10:37
Dexydog wrote:
14 Nov 2022, 10:06
Oh for Chist's does it matter WHY they're upside down, back to front, or missorts?.
The fact is they'll always be there which will cause the front line problems.
In the end that's the only thing that matters when we're talking about final mile delivery and a new cock eyed way of prepping it.
Some of the problems can be eliminated by the nominated person at a DO making sure that all the entries in Route Planner are always fully up to date, which would mean a greater % of the mail would arrive in the DOs sequenced.

Given that the DO I know of locally has already had their prep frames removed, my git feeling is that this time around, bench merging might be here to stay.
I don’t believe for one second that any DO has had ALL the frames removed already and nothing is being done about it

Have you seen this with your own eyes yeah?
If you tolerate this, then your paid break will be next
ted_e_bear
Posts: 4100
Joined: 03 Sep 2012, 19:37
Gender: Male

Re: Unagreed trial into a frameless office

Post by ted_e_bear »

Acca Dacca wrote:
14 Nov 2022, 10:39
SpacePhoenix wrote:
14 Nov 2022, 10:37
Dexydog wrote:
I don’t believe for one second that any DO has had ALL the frames removed already and nothing is being done about it

Have you seen this with your own eyes yeah?
Was just thinking the same, I don't believe it either, the whole idea can't possibly work until the mail drops off by about another 80%, so much that whilst on our route with parcels we're only delivering things like subscription magazines and "important" letters, so no bulk mailings, no shopping magazines, no d2ds.

Ah I think I get it now, the people responsible for this actually believe their own rubbish about how much the mail has dropped off, yes it certainly has but it's still a long way away from being able to efficiently arrange it in order without a fitting.
pieoftheday
Posts: 1838
Joined: 11 Mar 2010, 16:43
Gender: Male

Re: Unagreed trial into a frameless office

Post by pieoftheday »

SpacePhoenix wrote:
14 Nov 2022, 10:37
Dexydog wrote:
14 Nov 2022, 10:06
Oh for Chist's does it matter WHY they're upside down, back to front, or missorts?.
The fact is they'll always be there which will cause the front line problems.
In the end that's the only thing that matters when we're talking about final mile delivery and a new cock eyed way of prepping it.
Some of the problems can be eliminated by the nominated person at a DO making sure that all the entries in Route Planner are always fully up to date, which would mean a greater % of the mail would arrive in the DOs sequenced.

Given that the DO I know of locally has already had their prep frames removed, my git feeling is that this time around, bench merging might be here to stay.
Which office is it please?
Dexydog
Posts: 887
Joined: 14 Jan 2017, 13:54
Gender: Male

Re: Unagreed trial into a frameless office

Post by Dexydog »

Some of the problems can be eliminated by the nominated person at a DO making sure that all the entries in Route Planner are always fully up to date, which would mean a greater % of the mail would arrive in the DOs sequenced.


[/quote]

Mate, that sounds lovely, but you clearly have no idea how hard it is to get anyone to do anything to help you with getting your mech route changed at a DO.
We all still have our mech coming as if the last revision is in place- in other words it might as well be loose.
It is honestly the worst organised place to work in you could possibly imagine.
Bench merging- it literally is cloud cuckoo land.