ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
Members update
-
Mr Rush
- Posts: 3328
- Joined: 05 Aug 2011, 14:27
- Gender: Male
Re: Members update
Hah, bench merging. So your stuff comes in sequenced in a tray from the mail centre... but what about the loops you left the day before? Will that be sent back up to the MC to get resequenced, or is this going to be implemented hand-in-hand with 'commit to deliver'?
The machine stops.
-
ted_e_bear
- Posts: 4100
- Joined: 03 Sep 2012, 19:37
- Gender: Male
Re: Members update
That's what I thought, this character needs a new hobby, maybe just watch a movie/I'm a celebrity/EastEnders/anything really instead of posting stuff on heremjd24 wrote: ↑11 Nov 2022, 16:57Lol.SpacePhoenix wrote: ↑11 Nov 2022, 07:09I think that RM are seriously considering actually bring in bench merging. We've heard about a trial RM plan on running where for a batch, instead of a wave 1 and wave, the contents of both wave 1 and 2 get run AFTER the running of plan 1 (inward sort plan on an iLSM/IMP). If that were to get roled out aross the board, one of two things would happen.
1) All mech mail gets processed a day behind (which I don't think RM would be allowed to do under the current USO)
2) Final dispatches to DOs would be at least 4 hours later than their current time (so DOs FT would potentially be 11:00-19:00 or 12:00-20:00)
-
SpacePhoenix
- MAIL CENTRES/PROCESSING
- Posts: 12163
- Joined: 12 Nov 2008, 17:03
- Gender: Male
Re: Members update
Likely they'd be kept at the DO. With the proposal that we've heard of sequencing wave 1 and 2 together as one wave, we won't have the time to be resequencing odds and sods left over from walksMr Rush wrote: ↑11 Nov 2022, 18:02Hah, bench merging. So your stuff comes in sequenced in a tray from the mail centre... but what about the loops you left the day before? Will that be sent back up to the MC to get resequenced, or is this going to be implemented hand-in-hand with 'commit to deliver'?
-
Wolf91
- Posts: 506
- Joined: 06 Sep 2018, 17:22
- Gender: Male
Re: Members update
Remember, everything in SP’s world of MC will stay the same, because they simply have “no floor space”, or “no staff”; while every other aspect of the business will change radicallyted_e_bear wrote: ↑11 Nov 2022, 19:39That's what I thought, this character needs a new hobby, maybe just watch a movie/I'm a celebrity/EastEnders/anything really instead of posting stuff on heremjd24 wrote: ↑11 Nov 2022, 16:57Lol.SpacePhoenix wrote: ↑11 Nov 2022, 07:09I think that RM are seriously considering actually bring in bench merging. We've heard about a trial RM plan on running where for a batch, instead of a wave 1 and wave, the contents of both wave 1 and 2 get run AFTER the running of plan 1 (inward sort plan on an iLSM/IMP). If that were to get roled out aross the board, one of two things would happen.
1) All mech mail gets processed a day behind (which I don't think RM would be allowed to do under the current USO)
2) Final dispatches to DOs would be at least 4 hours later than their current time (so DOs FT would potentially be 11:00-19:00 or 12:00-20:00)![]()
-
guardianangel
- Posts: 1845
- Joined: 21 Feb 2020, 19:40
- Gender: Male
-
Cucumber
- Posts: 1052
- Joined: 09 Dec 2018, 10:24
- Gender: Female
Re: Members update
eh, they kind of are less efficient. the exception is the rare duties that you can do most of with very little movement of the van, which is basically a big drop off box.
-
SpacePhoenix
- MAIL CENTRES/PROCESSING
- Posts: 12163
- Joined: 12 Nov 2008, 17:03
- Gender: Male
Re: Members update
Take away the casuals/agency and we'd have to send all the mech as manual as all the mech staff would be needed on the Tracked and normal packets.Wolf91 wrote: ↑11 Nov 2022, 19:54Remember, everything in SP’s world of MC will stay the same, because they simply have “no floor space”, or “no staff”; while every other aspect of the business will change radicallyted_e_bear wrote: ↑11 Nov 2022, 19:39That's what I thought, this character needs a new hobby, maybe just watch a movie/I'm a celebrity/EastEnders/anything really instead of posting stuff on heremjd24 wrote: ↑11 Nov 2022, 16:57Lol.SpacePhoenix wrote: ↑11 Nov 2022, 07:09I think that RM are seriously considering actually bring in bench merging. We've heard about a trial RM plan on running where for a batch, instead of a wave 1 and wave, the contents of both wave 1 and 2 get run AFTER the running of plan 1 (inward sort plan on an iLSM/IMP). If that were to get roled out aross the board, one of two things would happen.
1) All mech mail gets processed a day behind (which I don't think RM would be allowed to do under the current USO)
2) Final dispatches to DOs would be at least 4 hours later than their current time (so DOs FT would potentially be 11:00-19:00 or 12:00-20:00)![]()
![]()
We're due to lose an iLSM to make room for a PSM, that'll take us down to 1 iLSM so if that breaks down on lates then everything will go as manual.
Oh well, when DOs end up being 12:00-20:00 due to MCs having to make dispatch times MUCH later as a result of this, you'll be told tough s**t, get on with it, you wanted MCs to change, you got what you wanted
-
steve1873
- Posts: 800
- Joined: 08 Oct 2007, 13:55
Re: Members update
Odds and sods. Entire walks, with multiple days mail in. How does that then get delivered alongside the freshly bench merged arrival mail?SpacePhoenix wrote: ↑11 Nov 2022, 19:45Likely they'd be kept at the DO. With the proposal that we've heard of sequencing wave 1 and 2 together as one wave, we won't have the time to be resequencing odds and sods left over from walksMr Rush wrote: ↑11 Nov 2022, 18:02Hah, bench merging. So your stuff comes in sequenced in a tray from the mail centre... but what about the loops you left the day before? Will that be sent back up to the MC to get resequenced, or is this going to be implemented hand-in-hand with 'commit to deliver'?
-
Mr Rush
- Posts: 3328
- Joined: 05 Aug 2011, 14:27
- Gender: Male
Re: Members update
You'll have the Day 1 bundle on your lower arm, the Day 2 bundle under your arm, and the D2D bundle on your shoulder held in place with your head. It's all been thought out.
The machine stops.
-
k979aaa
- Posts: 12578
- Joined: 03 Sep 2007, 19:14
- Gender: Male
- Location: THE NORTH
Re: Members update
And you have the option of shoving it up Simon Thompson's ass if your willing to strike with us all.
-
Dorset Plodder
- Posts: 4351
- Joined: 29 Apr 2009, 20:05
- Gender: Male
Re: Members update
I think the question that should be asked is:
"Why are you trying to introduce ANY kind of NEW system literally a month before the most BUSY time of the year Simon"!
The current system is definitely not perfect but most of us have been trying to fine tune it into some sort of system that we can work with..... for years. Plus we've had years of experience working with that adjusted system, we know what we're doing and it'll probably see us through Christmas Pressure.
What sort of a MORON has a completelty new Team Selection and brings in New coaches a week before any world cup final FFS!
The only logic I can see in this type of behaviour is if they're really trying to piss off the workforce and get them to jack without waiting for any Redundancy?
"Why are you trying to introduce ANY kind of NEW system literally a month before the most BUSY time of the year Simon"!
The current system is definitely not perfect but most of us have been trying to fine tune it into some sort of system that we can work with..... for years. Plus we've had years of experience working with that adjusted system, we know what we're doing and it'll probably see us through Christmas Pressure.
What sort of a MORON has a completelty new Team Selection and brings in New coaches a week before any world cup final FFS!
The only logic I can see in this type of behaviour is if they're really trying to piss off the workforce and get them to jack without waiting for any Redundancy?
Like all Wage Slaves, he had two crosses to bear: The people he worked for and the people he worked with! (Stephen Vizinczey.)