clashcityrocker wrote:Celgar wrote:number one wrote:This is a genuine picture taken in one of the “trial” offices . Look how happy they all look!!
They look like they have been beaten.
Wasn't it Stoke Newington that had an EP of about 40?
Very misleading as none of the required systems of EP or IWT was updated in the office or recorded. Their Weighted Items per work hour and their Weighted Items per gross hour which Off com us were high.
In terms of the Delivery Office Trial where Royal Mail believed that had found a silver bullet to efficiency in the way of not sorting sequencing work and D2D into a frame was proven to be unworkable.
In Stoke Newington"s case the trial was a sham and these are the reasons :
1. It can only work if Mail Centres produce 85% of work on a first wave on a daily basis. At the moment the top achieving mail centres are doing 85% and the worst 65%. Additionally due to the over night closures of the m1 and m6 are causing further delays in providing reliable mail flows to facilitate 85% of work on the first wave every day.
2. Because there was no work until the IPS was started ie nothing to prep , no double prep , than part timers who performed a pair on CDVs were never ready at the same time as a full timer on the same CDV.
3. The growth in Chinese parcels was a particularly problem bench merging.
Remember because the plan was you did not touch the first wave of work. Than there was no work to do until you prepped the manual and got your second wave of work which you would sort into the frame and than bench merge the work with your first wave, Due to the problems on the M1 and M6 the work on the second wave was often to much to really bench merge and often the trial was stopped to prevent a failure.
Remember this trial was carried out in the lightest period of the year and still failed to work.
As a result of this a number of the trail offices have been stopped and it is clear that Royal Mail"s policy of not throwing up sequencing work into a frame is another failed strategy.