LTB 286/13 - Delivery Tools,Tools and more Tools
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
LTB 286/13 - Delivery Tools,Tools and more Tools
LTB 286/13 - Delivery Tools Revision Planning and Weekly Resourcing Tools Update
No. 286/13
Ref: 230.03
Date: 2nd May 2013
To: All Branches with POSTAL Members
Dear Colleague
Delivery Tools - Revision Planning and Weekly Resourcing Tools update
Over recent months the CWU and Royal Mail have been working together updating current versions of the delivery tools, and also developing a nationally agreed tool that helps determine the number of Attendance calls on new delivery routes. Currently there are different processes being used in the field to determine attendance calls which creates disparity between units and an inconsistent approach to determining the actual workload. We have therefore developed a nationally agreed tool that will provide a more reliable and consistent approach to determining attendance calls. Below is a summary of the updated Tools, versions, and the target dates for release;
IWT v7.5
The new version of the IWT includes the Portering task plus several visual changes to the screens that will assist managers and reps in resource meetings. Due to the complex nature of determining the portering workload a joint validation will take place on the portering task plus other workload aspects that were not possible to include in this version of the IWT but it is the intention to include them at a later date. The release date for the new version of IWT is the 6th May 2013 with the first weeks DOM office performance reports being submitted to the centre w/c 13th May 2013.
Model Week Work Aide v2 (MWWA v2)
This revised version of the Model Week Work Aide will rank a units total traffic weeks in workload order and not just the total number of items as in the current version.
This will make it easier for CWU Reps and DOM's to determine the model week that fits the aspirations of their unit. This revised work aide is currently being re-programmed to incorporate the new IWT and the target date for release is 13th May 2013.
COMMUNICATION WORKERS UNION
URGENT INFORMATION FOR MEMBERS
Duty Builder v3.2
Due to the cell changes in the IWT v7.5 it is necessary to update the Duty Builder so that it is compatible with the new IWT when importing data for scheduling indoor workload. There have also been various other changes to improve the functionality of the tool for the user and it will provide better reports and checks than previous versions. This revised version will also give a breakdown of each duty's IPS and Prep, on each wave based on what is agreed in the revision. Duty Builder will no longer do any calculations but will allocate the agreed indoor and outdoor workload in line with the duty structure established as part of the revision.
The target date for release of version 3.2 will follow the release of IWTv7.5 above, and be 13th May 2013
Attendance Call Sampling Tool
This is now the nationally agreed tool and process to determine the amount of attendance calls that will be used in MIRA (manual interventions), to establish any extra workload that is not credited to a delivery route within the Geo-Route system.
Its primary use is to determine the level of attendance calls for new delivery routes within revision activity. It will also perform two important secondary functions.
1. It will produce a default percentage attendance call figure for your new route which will be used in Traffic Forecasting thus introducing an outdoor element in what is the biggest growth area. The process that produces the default figure for ongoing resourcing is a combination of a unit's revision sampling exercise and a traffic audit count undertaken at the same time.
2. It also uses Automis to give a more accurate percentage of mail going to each new delivery duty/route that is then used to allocate the required preparation time in Duty Builder. These figures should then be checked against the reported Walk Sequenced mech percentages once your revision has been running for 4 - 6 weeks.
The target release date for this new tool is 6th May 2013.
Delivery Traffic Forecasting Tool v2 (DTFT v2)
This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
This will be possible by establishing a default percentage attendance call figure for each delivery route as outlined above in the Attendance Call Sampling Tool (ACST)
This new version is still being developed but should be finalised by the end of May 2013.
COMMUNICATION WORKERS UNION
URGENT INFORMATION FOR MEMBERS
It should be noted that the new versions of IWT v7.5 and Model Week Work Aide v2 will not be applied to existing revisions that are at phase 2 or beyond. Equally units that are still at phase 1 but have already agreed their Model Week and Unit performance will also not use these versions of the tools in the existing revision process.
The associated agreed guidelines to all the new versions will be circulated in due course. We will also be providing update sessions for our trainers to bring them up to speed and making amendments to the joint delivery training workshops.
In addition to all of the above it is the intention to work with Royal Mail via the National Delivery Programme Group to jointly re-launch through joint presentations the Weekly Resourcing Meetings that will include the new version of the (DTFT v2) and the Weekly Resource Meetings Agenda.
Since the original launch of the Weekly Resource Meeting Agenda and Traffic Forecasting Process, we have had good examples of units undertaking meaningful weekly resourcing and traffic forecasting that has enabled them to jointly resource the operation in an efficient manner without entering into disputes on absorption when traffic is below model week and scheduling extra resource when it is above model week.
However, it has become evident that the process has not been used in whole or in part in the majority of delivery units for various reasons. In future it is essential that this process is embedded into delivery units and is undertaken on a regular weekly basis as a matter of course if we are to adequately and reliably deal with the continual challenges of mail volume and profile changes that impact on the staffing arrangements/resourcing issues within delivery units.
Any enquiries to Bob Gibson's Office, quoting reference 230.03
Email address: hnutley@cwu.org
Yours sincerely
Bob Gibson
COMMUNICATION WORKERS UNION
No. 286/13
Ref: 230.03
Date: 2nd May 2013
To: All Branches with POSTAL Members
Dear Colleague
Delivery Tools - Revision Planning and Weekly Resourcing Tools update
Over recent months the CWU and Royal Mail have been working together updating current versions of the delivery tools, and also developing a nationally agreed tool that helps determine the number of Attendance calls on new delivery routes. Currently there are different processes being used in the field to determine attendance calls which creates disparity between units and an inconsistent approach to determining the actual workload. We have therefore developed a nationally agreed tool that will provide a more reliable and consistent approach to determining attendance calls. Below is a summary of the updated Tools, versions, and the target dates for release;
IWT v7.5
The new version of the IWT includes the Portering task plus several visual changes to the screens that will assist managers and reps in resource meetings. Due to the complex nature of determining the portering workload a joint validation will take place on the portering task plus other workload aspects that were not possible to include in this version of the IWT but it is the intention to include them at a later date. The release date for the new version of IWT is the 6th May 2013 with the first weeks DOM office performance reports being submitted to the centre w/c 13th May 2013.
Model Week Work Aide v2 (MWWA v2)
This revised version of the Model Week Work Aide will rank a units total traffic weeks in workload order and not just the total number of items as in the current version.
This will make it easier for CWU Reps and DOM's to determine the model week that fits the aspirations of their unit. This revised work aide is currently being re-programmed to incorporate the new IWT and the target date for release is 13th May 2013.
COMMUNICATION WORKERS UNION
URGENT INFORMATION FOR MEMBERS
Duty Builder v3.2
Due to the cell changes in the IWT v7.5 it is necessary to update the Duty Builder so that it is compatible with the new IWT when importing data for scheduling indoor workload. There have also been various other changes to improve the functionality of the tool for the user and it will provide better reports and checks than previous versions. This revised version will also give a breakdown of each duty's IPS and Prep, on each wave based on what is agreed in the revision. Duty Builder will no longer do any calculations but will allocate the agreed indoor and outdoor workload in line with the duty structure established as part of the revision.
The target date for release of version 3.2 will follow the release of IWTv7.5 above, and be 13th May 2013
Attendance Call Sampling Tool
This is now the nationally agreed tool and process to determine the amount of attendance calls that will be used in MIRA (manual interventions), to establish any extra workload that is not credited to a delivery route within the Geo-Route system.
Its primary use is to determine the level of attendance calls for new delivery routes within revision activity. It will also perform two important secondary functions.
1. It will produce a default percentage attendance call figure for your new route which will be used in Traffic Forecasting thus introducing an outdoor element in what is the biggest growth area. The process that produces the default figure for ongoing resourcing is a combination of a unit's revision sampling exercise and a traffic audit count undertaken at the same time.
2. It also uses Automis to give a more accurate percentage of mail going to each new delivery duty/route that is then used to allocate the required preparation time in Duty Builder. These figures should then be checked against the reported Walk Sequenced mech percentages once your revision has been running for 4 - 6 weeks.
The target release date for this new tool is 6th May 2013.
Delivery Traffic Forecasting Tool v2 (DTFT v2)
This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
This will be possible by establishing a default percentage attendance call figure for each delivery route as outlined above in the Attendance Call Sampling Tool (ACST)
This new version is still being developed but should be finalised by the end of May 2013.
COMMUNICATION WORKERS UNION
URGENT INFORMATION FOR MEMBERS
It should be noted that the new versions of IWT v7.5 and Model Week Work Aide v2 will not be applied to existing revisions that are at phase 2 or beyond. Equally units that are still at phase 1 but have already agreed their Model Week and Unit performance will also not use these versions of the tools in the existing revision process.
The associated agreed guidelines to all the new versions will be circulated in due course. We will also be providing update sessions for our trainers to bring them up to speed and making amendments to the joint delivery training workshops.
In addition to all of the above it is the intention to work with Royal Mail via the National Delivery Programme Group to jointly re-launch through joint presentations the Weekly Resourcing Meetings that will include the new version of the (DTFT v2) and the Weekly Resource Meetings Agenda.
Since the original launch of the Weekly Resource Meeting Agenda and Traffic Forecasting Process, we have had good examples of units undertaking meaningful weekly resourcing and traffic forecasting that has enabled them to jointly resource the operation in an efficient manner without entering into disputes on absorption when traffic is below model week and scheduling extra resource when it is above model week.
However, it has become evident that the process has not been used in whole or in part in the majority of delivery units for various reasons. In future it is essential that this process is embedded into delivery units and is undertaken on a regular weekly basis as a matter of course if we are to adequately and reliably deal with the continual challenges of mail volume and profile changes that impact on the staffing arrangements/resourcing issues within delivery units.
Any enquiries to Bob Gibson's Office, quoting reference 230.03
Email address: hnutley@cwu.org
Yours sincerely
Bob Gibson
COMMUNICATION WORKERS UNION
good times, bad times you know I've had my share
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
It's not rocket science...it's much more complicated than that. 
good times, bad times you know I've had my share
-
P13
- Posts: 1016
- Joined: 11 Oct 2007, 14:35
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
There are plenty of tools in my office , most of them are managers 
-
Danelectro
- Posts: 1058
- Joined: 13 Apr 2008, 01:02
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
really
really
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
It looks something like this Dan..Danelectro wrote:This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
really

good times, bad times you know I've had my share
-
RTP
- Posts: 863
- Joined: 22 Apr 2011, 14:24
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
And still we have no extra time built in for 'deliver to neighbour' and that's because.....wait for it.......'it doesn't take any longer than it did before we never delivered to neighbour'. Meanwhile in the real world a lot of posties aren't delivering to neighbours, because they don't have time and the public don't have the service they were promised, probably 50% of the time. Now it's all very well and good having MIRA, but unless this time for the above is built in then it still won't give a true reflection of what time is actually needed to do the job properly.
-
dvbuk55
- EX ROYAL MAIL
- Posts: 16650
- Joined: 02 Jun 2007, 19:17
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
fishtank wrote:It looks something like this Dan..![]()
Actually I thought that was how all the planning for Royal Mail was organised - "I see vans, lots of vans and trolleys, lots of trolleys,"
-
mandelsons_toenail
- Posts: 1294
- Joined: 08 Aug 2009, 18:16
- Gender: Male
- Location: Outer Hebrides
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
Danelectro wrote:This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
really
Are they for real?
My Dom doesn't know his head from his arsehole and you're telling me he will go all jonny wishbone on me and predict how many attendance calls I will get
This is ridiculous
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
There are very few reps who have the kind of release time necessary to use the resource tools properly.
I would doubt that there are many managers using them properly.
Agreeing to the sciencing up of delivery resource planning was a stupid mistake compounded by the constant release of new versions.
Someone,somewhere needs to stop this.
I would doubt that there are many managers using them properly.
Agreeing to the sciencing up of delivery resource planning was a stupid mistake compounded by the constant release of new versions.
Someone,somewhere needs to stop this.
good times, bad times you know I've had my share
-
Cut Off King
- Posts: 1078
- Joined: 23 Jun 2009, 21:18
- Gender: Female
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
I wish I lived in the same "MAGICAL LAND" that RM HQ & CWU HQ live in.
It sounds wonderful.
Meanwhile the rest of us are in reality...........
It sounds wonderful.
Meanwhile the rest of us are in reality...........
-
Pinky 1
- Posts: 1510
- Joined: 01 Mar 2009, 11:38
- Gender: Male
- Location: Wales
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
It should be noted that the new versions of IWT v7.5 and Model Week Work Aide v2 will not be applied to existing revisions that are at phase 2 or beyond. Equally units that are still at phase 1 but have already agreed their Model Week and Unit performance will also not use these versions of the tools in the existing revision process.
So tell me, how many units could actually use this ....... if they could understand it ?
So tell me, how many units could actually use this ....... if they could understand it ?
"Cara yn bod 'n briod , dydy 'n fawr at ca a hun 'n anad berson a 'ch angen at blina achos 'r bwyso chan 'ch buchedd "
" I like being married,, it's great to find that one special person you want to bother for the rest of your life "
" I like being married,, it's great to find that one special person you want to bother for the rest of your life "
-
Danelectro
- Posts: 1058
- Joined: 13 Apr 2008, 01:02
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
or stop him,the only job I want to see lapsed this summer is Bob Gibsonsfishtank wrote:
Someone,somewhere needs to stop this.
-
silly suffolk
- MAIL CENTRES/PROCESSING
- Posts: 728
- Joined: 04 Mar 2011, 21:31
- Gender: Male
- Location: deepest suffolk
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
there are times when national officers totally lose the plot. this is one of those times. how the f##k can a local rep with no release time make head nor tail of this pile of crap.
-
macphee1
- Posts: 105
- Joined: 18 Oct 2009, 13:08
- Gender: Male
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
I have a 100% accurate forecasting method for attendance calls, that takes no time at all. When I load the van I count themDanelectro wrote:This version will include an outdoor element that will enable units to forecast the level of attendance calls within weekly resource meetings.
really
-
clashcityrocker
- Posts: 16425
- Joined: 22 Sep 2009, 13:50
- Gender: Male
- Location: strummerville
Re: LTB 286/13 - Delivery Tools,Tools and more Tools
Perhaps we should just make up our own version of the iwt.
And go into the next resourcing meeting "armed" with iwt version 8.5.
Would your DOM have a clue?
And go into the next resourcing meeting "armed" with iwt version 8.5.
Would your DOM have a clue?