To: Branches with POSTAL Members
Dear Colleague,
Royal Mail & CWU Indoor Work Method Guidance Version 1 February 2012
Further to LTB 70/12 which detailed the agreement on Indoor Work Methods, the CWU Website has now been updated to include all the health & safety guidance documents relevant to the agreement.
When discussing indoor methods locally please ensure that all of the documentation is fully utilised and followed correctly.
Any enquiries to Bob Gibson’s Office, quoting reference 230.03
Email address: hnutley@cwu.org
Yours sincerely
Bob Gibson
CWU Assistant Secretary
Task 09e - DP Indoor work method improvement Gantt Chart (Feb 12)
Task 09f - DP Indoor Scope and Assets
Task 14a - DP Indoor Work Method improvement start up Meeting Agenda
Task 14b - DP Delivery Office Site Inspection
Task 14c - DP Indoor Method Improvement Agenda for Workshop
Task 14d - DP Indoor Work Method Improvement Principles Overview v3
Task 14e - DP Safety Concurrence - Indoor Work Method Improvement Final
Task 14f - DP Royal Mail & CWU Indoor Methods Guidance V1
Task 15a - DP Excel Floor Planning Tool to Use (C)
Task 15c - DP How to Use the Excel Floorplanning Tool Guide
Task 16 - DP IWT Version 7 4 Upgrade_Quick Reference Guide
Task 20a - DP Sorting Frame Requirement Indicator Guidelines v2.0
Task 20b - DP Sorting Frame Requirement Indicator Master v2.0
Task 22a - DP Floorplanning Checklist v2
Task 22b - DP Indoor work method improvement space standards v1.4
Task 22c - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 22d - DP Unit Risk Assessment Review
Task 22f - DP Indoor Pre Method Improvment Photograph List
Task 23a DP Excel Floor Planning Tool to Use
Task 23b - DP Indoor work method improvement space standards v1.4 Final
Task 31a - DP Unit Indoor work methods layout Sign off [CA]
Task 31b - DP SAC1 v2.5 (for building and Refurbishment work) [CA]
Task 45a - DP Measurement and Display Slides [R]
Task 45b - DP Tracked and SD Measurement and Display chart [C]
Task 45c - DP Manual Measurement and Display Boards_v1.0 (C)
Task 45d - DP Where to find Planned Actual Performance data within IWT for Display v1.0 [R]
Task 45e - DP Daily Huddles Guidance [R]
Task 46a - DP IPS Fillets - Best Practice Examples [R]
Task 47a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 47b - DP York Safe System Of Work v2.3 [R]
Task 47c - DP Training Frame-Trolley1.1 [R]
Task 47d - DP Work Equipment Risk Assessment [C]
Task 48a - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 48b - DP Workplace Risk Assessmemt Manual WP1 [C]
Task 48c - DP First Aid Risk Assessment v 2.3 (C)
Task 48d - DP Fire Risk Assessment Guidance [R]
Task 48e - DP Fire Risk Assessment Review [C]
Task 65a - DP Delivery Office FM Works Completion sign off [CA]
Task 65b - DP Example Method Statement [R]
Task 65c - DP Job completion sheet vers 0.2 (R)
Task 66a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 66b - DP York Safe System Of Work v2.3 [R]
Task 66c - DP Training Frame-Trolley1.1 [R]
Task 106a - DP Indoor work method PER [CA]
Task 106b - DP Final Layout Changes [R]
Task 106c - DP SAC3 Unit Post deployment Q set Feb Final
Task 144c - DP Post Indoor Flow Photograph List [CA]
Task 150b - DP Indoor Flow Layout Deployed Sign off [CA]
The documents can be found on the following web address link:
Link stopped working when the cwu updated their website.