ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE

ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!

Emission savings for Royal Mail

Latest Royal Mail and CWU news.This is an open forum.
TrueBlueTerrier
FORUM ADMINISTRATOR
Posts: 72626
Joined: 30 Dec 2006, 10:29
Gender: Male
Location: On my couch

Emission savings for Royal Mail

Post by TrueBlueTerrier »

http://www.lowcarboneconomy.com/profile ... mail/13684" onclick="window.open(this.href);return false;

Project architect: PRS Burks Green, Newark
Main contractor: Winvic Construction
Cladding contractor: Yorkshire Sheeting and Insulation Services
ystem manufacturer: CA Building Products
Systems: Twin-Therm® (roof and walls) combined with a 800m2 SolarWall®
Total roof area: 18,000m²
Estimated energy savings: 233, 396 kWh
Estimated carbon dioxide savings: 59 tonnes per year
Benefits
• CarbonNeutral building envelope
• Dedicated system with all components direct from CA Building Products
• Certificate of building air permeability showing a result of 2.3m3/hr/m2 at 50 Pascals
• Thermal bridging is virtually eliminated
• Sheets supplied sequentially to reduce build times and improve safety
• External roof and wall (excluding the SolarWall®) manufactured in Corus HPS200 Ultra® supplied with the Corus Confidex® Guarantee
• Roof, wall, firewall and all insulation classified in its own right as non-combustible
• Entire system guaranteed for 25 years
• Building achieved a BREEAM "Excellent" rating
• SolarWall® helped reduce operational energy use by a third
• The project was shortlisted for the Estates Gazette Green Awards

When Royal Mail decided to re-locate its distribution hub in Northampton, it called upon ProLogis and Aviva Investors to provide a building that would meet its sustainability requirements and its specific business needs. As a result, the Carbon Neutral building has been awarded a BREEAM "Excellent" accreditation and an energy performance certificate (EPC) "A" rating (carbon dioxide index 21). This was achieved with the help of suppliers such as CA Building Products, which provided the building envelope along with an 800m2 SolarWall® to help heat the facility.

Twin-Therm® cladding system
The building envelope was supplied as Twin-Therm®, a site assembled roof and wall cladding system that provides a non-fragile assembly with guaranteed U-values. The Twin-Therm® system includes a lightweight liner panel which is quick to install, making the building watertight earlier than other systems, thus enabling work to commence inside the building sooner and helping to speed up the critical path. Once the LT 17 1000S liner is fully fixed and sealed at side laps and end laps it becomes fully non fragile. The systems design and installation method allows for the insulation to be installed continuously, prior to fixing of the spacer systems, minimising thermal bridging. The Therma-bar is then installed on top of the insulation eliminating the need to cut and tuck.

Air tight building envelope
The Twin-Therm® system also ensures that the building is extremely air tight due to its flexibility. Air leakage has been identified as the major source of heat loss from a building's interior. This heat loss not only contributes to higher building running costs but increases unnecessary CO2 emissions due to the additional heating load required to replace it. Gaps occur for air to leak out of when the cladding system is too rigid and requires precise steelwork tolerances in order for the installation to be completed correctly. The liner panels that are provided with CA Building Products built up roof and wall cladding systems have the built in flexibility to cope with steelwork tolerances unlike rigid panel systems. This ability to follow the flow of purlins which have sagged or deflected has enabled this building to achieve an air tightness of 2.3 m³/hr/m² at 50 pascals.

Sequential sheeting
ProLogis, the developer on the project chose the Twin-Therm® system to be delivered with the "sequential sheeting" packing system, which provided the liner panels and external profiled sheets packed in the order in which they were installed onto the roof, reducing the build time considerably. Traditionally, roof sheets are packed by the manufacturer according to their size and then delivered to site. Once they arrive on site the roofing contractor then needs to unpack the sheet bundles and repack the sheets in the order in which they will be installed. This is often done at ground or at roof level. Either way, this practice is often time consuming and puts both the products and the contractors under a great deal of unnecessary risk from injury or damage.

As CA Building Products is part of CA Group which has a contracting arm, they are able to understand the needs and wants on the roofing contractor and offer solutions to help. By working with the specifier, main contractor and cladding contractor, CA can ensure that the roofing and cladding sheets are ordered, produced, packed, loaded and installed in the order in which they are required on the roof.

Solar air heating system
The distribution centre was also fitted with an 800m2 SolarWall® to help maintain a comfortable temperature for staff working in the sorting hall.

The SolarWall® transpired solar collector is an innovative solar air heating system that utilises solar radiation to deliver naturally warmed fresh air into buildings. The SolarWall® was installed as an "additional skin" to the buildings southerly facing facade. It was manufactured in the CA ARC 50 930 profile using Corus Colorcoat Prisma® (Zeus) and was laid horizontally along the elevation to be more architecturally pleasing. The SolarWall® consists of a coated, profiled steel sheet with thousands of tiny perforations uniformly spaced across the full face of the collector. It was installed such as that an air cavity was created between the collector and the original elevation. As sunlight strikes the surface of the SolarWall® and is absorbed, solar heat conducts to the thermal boundary layer of air which lines the outer surface of the panel. This heated boundary layer of air is then drawn through the perforations, into the air cavity, before the heat can escape by convection, virtually eliminating heat loss from the surface of the plate.

The SolarWall® system is utilised as a pre-heater to two Nordair Niche heating and ventilation units which serve a full air induction system, installed by Air Technology Systems (ATS).
It is estimated that the SolarWall® at Swan Valley will save Royal Mail 233,396 kWh a year and 59 tonnes of carbon dioxide per year, helping them achieve their strict environmental criteria.
The SolarWall® has been independently tested, monitored, recorded and proven by BSRIA to produce heating cost savings of 50% and an independently thermally modelled report by Battle McCarthy proved SolarWall® can provide up to 20% of a building's total energy requirements. SolarWall® is recognised globally as a renewable energy form in its current right making it the perfect choice for Royal Mail.

CarbonNeutral
The Twin-Therm® system and SolarWall® come with the Corus Confidex Sustain® Guarantee, ensuring all of the unavoidable carbon emissions created throughout their entire life, cradle to cradle, is offset by investing in environmental projects worldwide.
All post by me in Green are Admin Posts.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
Darren Bent
Posts: 2150
Joined: 05 Oct 2007, 15:38
Gender: Male
Location: Pride Park, Derby, DE24 8XL

Re: Emission savings for Royal Mail

Post by Darren Bent »

Don't forget extra pollution from cars, and van sharing and lorries and aeroplane.
Judgee
EX ROYAL MAIL
Posts: 2261
Joined: 23 Oct 2007, 15:18

Re: Emission savings for Royal Mail

Post by Judgee »

Yup 30,000 extra vans on the road RM is certainly going green....not! :whistle
Union what Union? Do we have a union?
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: Emission savings for Royal Mail

Post by DGP1 »

But they're getting rid of 1000's of managers...............so a reduction in the hot air they emit (not to mention the massive savings made from not using the tea/coffee machine).
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
TrueBlueTerrier
FORUM ADMINISTRATOR
Posts: 72626
Joined: 30 Dec 2006, 10:29
Gender: Male
Location: On my couch

Re: Emission savings for Royal Mail

Post by TrueBlueTerrier »

THE release of last year’s economic figures on March 3rd was cue for much crowing in Brazil. The economy grew by a blistering 7.5%, a rate unmatched since 1986. However,the president, Dilma Rousseff warned that disturbing information about a downturn in consumption in the UK market was being received as he spoke. But the citizens of Brazil should not panic as urgent meeting with Moya Greene was in the process of being arranged. An arrangement where the Brazilian Government paid the wages of 1,000 Royal Mail staff could not be ruled out at this time. :cuppa :chuckle :chuckle :chuckle :chuckle :chuckle
All post by me in Green are Admin Posts.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
dazarooney
Posts: 1
Joined: 29 Mar 2011, 15:05
Gender: Male

Re: Emission savings for Royal Mail

Post by dazarooney »

Darren Bent wrote:Don't forget extra pollution from cars, and van sharing and lorries and aeroplane.
Couldn't agree more.
bob dudd
Posts: 21
Joined: 23 Mar 2011, 14:03
Gender: Male

Re: Emission savings for Royal Mail

Post by bob dudd »

What a load of s**t. Emissions whats that when its at home 9 vans and cars in one area doing absorption is that Emission friendly.. what a waste of money. THATS WHERE PART OF THE 1.2 BILLION WENT ALONG WITH OTHER X FAILED POSTMENS IDEAS. That loan is now 2 Billion cos it has intrest,and as it is a government loan,.how can that be right. Government loaning money to itsself charging intrest sounds, like a good earner to me.
bob dudd
Posts: 21
Joined: 23 Mar 2011, 14:03
Gender: Male

Re: Emission savings for Royal Mail

Post by bob dudd »

Oh,dont leave your van running in the yards either...LMFAO
bob dudd
Posts: 21
Joined: 23 Mar 2011, 14:03
Gender: Male

Re: Emission savings for Royal Mail

Post by bob dudd »

Stupid company, with NO REAL PLANS. Only IDEAS.
ackworthjaguar
Posts: 1
Joined: 04 Nov 2011, 14:55
Gender: Male

Re: Emission savings for Royal Mail

Post by ackworthjaguar »

Some great responses..... :crazy:
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32737
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Emission savings for Royal Mail

Post by POSTMAN »

ackworthjaguar wrote:Some great responses..... :crazy:
Fill us in then. :Very Happy
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
Judgee
EX ROYAL MAIL
Posts: 2261
Joined: 23 Oct 2007, 15:18

Re: Emission savings for Royal Mail

Post by Judgee »

To make P & L greener a new RM initiative has been released. All non-drivers in the P & L partnership must push the vans around the walks, drivers will no longer be allowed to use fuel! :nana
Union what Union? Do we have a union?
axeman
Posts: 1733
Joined: 12 Jun 2007, 17:57

Re: Emission savings for Royal Mail

Post by axeman »

Thats where your 'share' money went :wink: royal fail has purchased a few acres of trees to offset it's carbon emissions :shock: no more green than esso and the rest of the petroleum companys who only think of profit margins
andy2007
Posts: 3971
Joined: 14 Sep 2007, 10:16
Gender: Male
Location: Earth

Re: Emission savings for Royal Mail

Post by andy2007 »

It's all PR. They can claim that they're Green, by "offsetting" their carbon emissions. But in reality, any gains they make, they're at best, negating. More likely increasing, because of the extra miles driven by RM vehicles. All these merged sites, mean extra mileage for the Mail to travel. It has to get there somehow. :hmmmm Then there's all the vans, replacing bikes. Well that's a no-brainer! Bikes don't produce emissions, other than the breath of the rider. But no matter how efficient the vans are, there's always CO2 emissions. It all adds up. :hmmmm
Don't knock Insanity
it's just another outlook on Reality!