Re: all revisions suspended.
Plan 'b' is easy,make revisions that work,not plan 'a' which was make revisions that save as much as possible. 
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: all revisions suspended.
The inputs were fine,in our case they were triple checked at the highest level.skull wrote:I don't know if any planners read these forums and this is just a suggestion but when you put the details in the computer to work out the size of our duties , should you have put 3.67 kilometres per hour instead of 3.67 mph . Everyone who has been involved in revision seems to have been incompetent so this might of been a slight technicality overlooked .
The two main issues that caused the problems were the use of the lowest traffic week and the inclusion of tuesday in the traffic model.
Both were flagged up at the time and our objections to both were rejected at Divisional and Director level.
That is why the Indoor Workload Tool didn't provide enough hours and why pegasus threw out walks that were based on unrealistic traffic levels.
Therefore the whole revision was built on sand.
good times, bad times you know I've had my share
-
dvbuk55
- EX ROYAL MAIL
- Posts: 16650
- Joined: 02 Jun 2007, 19:17
- Gender: Male
Re: all revisions suspended.
Ditto! Same result. As for revisions being called off........just wonder how much scrap value the WSMs, vans, HCTs and LCTs have...........maybe they could get some money backfishtank wrote:The inputs were fine,in our case they were triple checked at the highest level.skull wrote:I don't know if any planners read these forums and this is just a suggestion but when you put the details in the computer to work out the size of our duties , should you have put 3.67 kilometres per hour instead of 3.67 mph . Everyone who has been involved in revision seems to have been incompetent so this might of been a slight technicality overlooked .
The two main issues that caused the problems were the use of the lowest traffic week and the inclusion of tuesday in the traffic model.
Both were flagged up at the time and our objections to both were rejected at Divisional and Director level.
That is why the Indoor Workload Tool didn't provide enough hours and why pegasus threw out walks that were based on unrealistic traffic levels.
Therefore the whole revision was built on sand.
-
skull
- Posts: 450
- Joined: 15 Nov 2010, 19:31
- Gender: Male
Re: all revisions suspended.
This is simple when plan b is put into action feed kilometres instead of miles into the computer . Using kilometres will make our duties 3/8 th smaller . Everyone's a winner , management get to use their modernisation tool successfully , the CWU can claim they have got the best deal for it's members and we get achievable work loads .The discrepancy between miles and kilometres can just be brushed under the carpet . When I read this back it doesn't sound that daft because duties 3/8 th smaller would be about right . Brilliant I'll email Moya with the details . Oh I forgot we would have to employ another ten thousand staff or make thousands full time , f*ck back to the drawing board .
Last edited by skull on 15 Jan 2011, 16:29, edited 1 time in total.
-
skull
- Posts: 450
- Joined: 15 Nov 2010, 19:31
- Gender: Male
Re: all revisions suspended.
dvbuk55 wrote: Ditto! Same result. As for revisions being called off........just wonder how much scrap value the WSMs, vans, HCTs and LCTs have...........maybe they could get some money back
The vans should be used because the one good thing to come out of revision is the removal of use of private cars .
-
mclovin
- Posts: 1106
- Joined: 11 Feb 2009, 18:39
- Gender: Male
Re: all revisions suspended.
Well fishtank you shouldnt be using pegasus anyway, it should be geo route, thats why Durhams failed.
Also the program had the vans conveying at a steady 30mph from office to delivery, loop to loop and delivery back to office, not taking into account acceleration, braking, traffic, lights, roundabouts or any other stoppages or slowing down.
Both RM and CWU should have had all these problems sussed long before implementation.
Its currently costing them an absolute fortune, and theyre skint.
P&L is a dead duck and will soon be abolished across the board.
As will working Saturdays.
Also the program had the vans conveying at a steady 30mph from office to delivery, loop to loop and delivery back to office, not taking into account acceleration, braking, traffic, lights, roundabouts or any other stoppages or slowing down.
Both RM and CWU should have had all these problems sussed long before implementation.
Its currently costing them an absolute fortune, and theyre skint.
P&L is a dead duck and will soon be abolished across the board.
As will working Saturdays.
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: all revisions suspended.
Q&A's on Pegasus/Georoute as of December 2010
RM answers in red
The concern was that speeds, specifically walking speeds were not sustainable throughout the entire delivery round especially with longer spans
It is the business' view that the set of parameters that come together to optimise delivery routes adequately produce routes that are achievable, fair and realistic. There is a set process within the revision cycle to validate optimised routes to confirm its achievability and incorporate local variables were applicable
Average speed for male and female employees
All jobs within RM letters are planned on standards that a trained employee can achieve and we do not discriminate for gender.
The CWU do not believe that the time within the system is sufficient for undertaking attendance calls.
The attendance call times are reasonable and reflect the mail profile and current operation.
System still may not be crediting some routes with enough attendance call items.
Instances where it can be demonstrated that the average attendance calls exceeds that provided in Pegasus, there are clear processes and the facility within the planning toolset to address the issue
100BSI The ability to set outdoor performance similar to the capability in IWT
Outdoor performance standards are based on what a trained employee can achieve.
Vehicle Speeds To discuss the appropriateness of these speeds and its application to route design
The current version of GeoRoute has the intelligence to apply road speed in much realistic manner than in the previous version, where local circumstances differ from the optimum solution, there is set process for escalating and amending road speeds to represent local operation
Clearer understanding on how Pegasus integrates replenishment methods into optimisation and concerns that this process may not be adhered to.
Pegasus does fully incorporate all replenishment point supplied. It will allocate the appropriate time to and from points of replenishment as well as applying the relevant service time at these points
Understand how the outputs of the two versions of GeoRoute compare
RM does not have a licence for v2001 anymore, to do this RM will have to purchase a licence for an obsolete tool
No workload in Geo-Route for welfare stops
No resolution, refer issue back to main workshop group.
Why RA or fatigue allowance is only applied to indoor planning values and not outdoor
The values contained within the outdoor tool are based on what trained individuals are able to achieve. It would not be appropriate to add in relaxation allowances as this would build in too much time
Understand how travel/acceleration to first point of delivery and how ancillary activities prior to delivery are incorporated
Pegasus does fully uses the road network to establish travel times and also allows time for ancillary activities such dropping off colleagues etc
Understand how routes and loops are constructed, Adherence to SSOW and clarity weight management using HCT on steep terrain
Explanation of route and loop design shared, SSOW documents for the different equipment type also available. Guidance on planning routes to manage terrain also available to the planning community
How Pegasus establishes path lengths and how non standard path lengths are addressed during route design
Pegasus does establish the average path length of every street segment. However should this number not reflect reality, there is a facility available to apply measured values that are auditable
Why is it then...such an epic failure.....?
RM answers in red
The concern was that speeds, specifically walking speeds were not sustainable throughout the entire delivery round especially with longer spans
It is the business' view that the set of parameters that come together to optimise delivery routes adequately produce routes that are achievable, fair and realistic. There is a set process within the revision cycle to validate optimised routes to confirm its achievability and incorporate local variables were applicable
Average speed for male and female employees
All jobs within RM letters are planned on standards that a trained employee can achieve and we do not discriminate for gender.
The CWU do not believe that the time within the system is sufficient for undertaking attendance calls.
The attendance call times are reasonable and reflect the mail profile and current operation.
System still may not be crediting some routes with enough attendance call items.
Instances where it can be demonstrated that the average attendance calls exceeds that provided in Pegasus, there are clear processes and the facility within the planning toolset to address the issue
100BSI The ability to set outdoor performance similar to the capability in IWT
Outdoor performance standards are based on what a trained employee can achieve.
Vehicle Speeds To discuss the appropriateness of these speeds and its application to route design
The current version of GeoRoute has the intelligence to apply road speed in much realistic manner than in the previous version, where local circumstances differ from the optimum solution, there is set process for escalating and amending road speeds to represent local operation
Clearer understanding on how Pegasus integrates replenishment methods into optimisation and concerns that this process may not be adhered to.
Pegasus does fully incorporate all replenishment point supplied. It will allocate the appropriate time to and from points of replenishment as well as applying the relevant service time at these points
Understand how the outputs of the two versions of GeoRoute compare
RM does not have a licence for v2001 anymore, to do this RM will have to purchase a licence for an obsolete tool
No workload in Geo-Route for welfare stops
No resolution, refer issue back to main workshop group.
Why RA or fatigue allowance is only applied to indoor planning values and not outdoor
The values contained within the outdoor tool are based on what trained individuals are able to achieve. It would not be appropriate to add in relaxation allowances as this would build in too much time
Understand how travel/acceleration to first point of delivery and how ancillary activities prior to delivery are incorporated
Pegasus does fully uses the road network to establish travel times and also allows time for ancillary activities such dropping off colleagues etc
Understand how routes and loops are constructed, Adherence to SSOW and clarity weight management using HCT on steep terrain
Explanation of route and loop design shared, SSOW documents for the different equipment type also available. Guidance on planning routes to manage terrain also available to the planning community
How Pegasus establishes path lengths and how non standard path lengths are addressed during route design
Pegasus does establish the average path length of every street segment. However should this number not reflect reality, there is a facility available to apply measured values that are auditable
Why is it then...such an epic failure.....?
good times, bad times you know I've had my share
-
skull
- Posts: 450
- Joined: 15 Nov 2010, 19:31
- Gender: Male
Re: all revisions suspended.
maybe Pegasus/ Georoute has the answer ? .fishtank wrote:
Why is it then...such an epic failure.....?
-
chrisj
- Posts: 1883
- Joined: 21 Dec 2010, 16:24
- Gender: Male
Re: all revisions suspended.
I have not read the whole thing but the one about the path length is so so funny. From path to door of my house is about 15 feet but I have been to houses where the path to front door is about 80-100 feet. And some are like climbing Ben Nevis and coming back down with a big back on a wet day is like an assualt course.
Even some terraced houses where you can see the door to the other house is about 10 feet but you have to all the way round gardens and hedges and all sorts to actually get there.
Even some terraced houses where you can see the door to the other house is about 10 feet but you have to all the way round gardens and hedges and all sorts to actually get there.
-
pants123
Re: all revisions suspended.
Your making RM's problems your own , just detach yourself from it and you will feel a lot better .[/quote]skull wrote:YOUR NOT REAL,,,,,,,,,,,POSTMAN COME TO MY OFFICE AND DO A WALK you will soon understand,,,, start at 6.30a.m 2 hours sorting only 3 people doing the work of 12 people on the ips, mail left everywhere in the office because it cannot be sorted. then prep a 1000 point delivery in 45 mins( impossible) and prep 4 lots of D2D items takes 2 hours, 3 rough bags full of packets... then do 10 redirections, then bundle up takes 35 mins,, then go out on a geo-route delivery that says it can be done in 4 hours.......... when it takes 5 25 mins to deliver.. thats not including a break, or going to the toilet,, and you tell me to chill...... you are so wrong my friend,,,,,,,,, so,, so ,,,,,,, wrong..![]()
![]()
im not making royal mail problems my own,, its been forced on us, management saying you do it or else we bully you.. because goe-route and the planner said posties can do it..
-
whatamess!!
- Posts: 279
- Joined: 13 Jan 2011, 17:43
- Gender: Female
Re: all revisions suspended.
We still have not got an answer to the original statement, are all revisions suspended?? Anyone from higher up in the union know?? Dingo maybe??
-
donut
- Posts: 351
- Joined: 16 Sep 2007, 09:55
Re: all revisions suspended.
Sorry...can someone give me some concrete evidence of the so called "suspension of revision", all i can gather from the different threads is an email has been recieved stating the fact ....is that all we`re going on ??
TBT/ POSTMAN , is there any evidence i`ve missed ?
TBT/ POSTMAN , is there any evidence i`ve missed ?
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: all revisions suspended.
You only joined royalmailchat on thursday and you're calling for dingo.whatamess!! wrote:We still have not got an answer to the original statement, are all revisions suspended?? Anyone from higher up in the union know?? Dingo maybe??
Does his reputation proceed him that much or are you a personal friend?
Where is The Truth!!!!!!!!! these days?...i miss him.....
good times, bad times you know I've had my share
-
dvbuk55
- EX ROYAL MAIL
- Posts: 16650
- Joined: 02 Jun 2007, 19:17
- Gender: Male
Re: all revisions suspended.
The Truth................You cain't handle the Truth............courtesy Jack N, from A Few Good Menfishtank wrote:You only joined royalmailchat on thursday and you're calling for dingo.whatamess!! wrote:We still have not got an answer to the original statement, are all revisions suspended?? Anyone from higher up in the union know?? Dingo maybe??![]()
Does his reputation proceed him that much or are you a personal friend?![]()
Where is The Truth!!!!!!!!! these days?...i miss him.....
-
whatamess!!
- Posts: 279
- Joined: 13 Jan 2011, 17:43
- Gender: Female
Re: all revisions suspended.
Maybe 'the truth' is out there!!!fishtank wrote:You only joined royalmailchat on thursday and you're calling for dingo.whatamess!! wrote:We still have not got an answer to the original statement, are all revisions suspended?? Anyone from higher up in the union know?? Dingo maybe??![]()
Does his reputation proceed him that much or are you a personal friend?![]()
Where is The Truth!!!!!!!!! these days?...i miss him.....