johnnyrocker wrote:Been working on the revision, told today that 3 duties to come out on the 27th of this month and 8 more next month. Havent been able to cope with workload over last two weeks with 50 odd walks so how do they expect us to cope with 40 with the run up till Xmas.
That sounds more like a carve up than a revision.....20% walks to go FFS.
I know it's probably pointless but....does your ADR go along with these figures?....it sounds brutal.
johnnyrocker wrote:Been working on the revision, told today that 3 duties to come out on the 27th of this month and 8 more next month. Havent been able to cope with workload over last two weeks with 50 odd walks so how do they expect us to cope with 40 with the run up till Xmas.
That sounds more like a carve up than a revision.....20% walks to go FFS.
I know it's probably pointless but....does your ADR go along with these figures?....it sounds brutal.
But I thought the agreement stated "revisions would not be cost driven"
Well I'd be a little reluctant to publicise that fact when RM and the CWU have said they would not countenance any delay in moving forward.
Aah but they overlooked annual leave, I had a week off then the DOM had a two weeks off. Mapping verification needs to be done IWT parameters need to be discussed/agreed, data still to be shared with me phase 1 far from completed.
A little matter of release might help get the revision going, but hey why worry, nowt is signed yet in terms of phase 1 and 2 and nowt will be untill Ive had release time to have a proper conservation with the DOM and either agree or dissagree model week figure and DTD figures. 121 thingys need to take place as well.
I have been informed by the DSM that we dont need to sign anything off till phase 4 ????? what the heck... lucky our Area and Div rep are bumping heads about that one ... but if the rumours are true we no need to worry about bigger things
johnnyrocker wrote:Been working on the revision, told today that 3 duties to come out on the 27th of this month and 8 more next month. Havent been able to cope with workload over last two weeks with 50 odd walks so how do they expect us to cope with 40 with the run up till Xmas.
Hi johnny !
Does this mean that u have had 11 dutys removed, and will they be made redundand ?
Cheers Tappachappa
If managers want to bypass me, they are most welcome but they cant expect me to put their crap to a vote of the mbrs.
The DSM in my patch has made it clear to the DOMS he wants reps released from duty to work on the revisions, the only issue I can forecast for my D.O is being able to agree on traffic figures for the IWT and DTD figures for IWT.
Of course we aint going along with these figures.They have been trying to stitch us up for the last two years and they can keep on trying. First come out with the figure before last years Industrial Action. Gave me a nice little printed folder with all the new walks that the system had thrown up.Biggest pile of poo i had ever seen. Planner kept mentioning the magical word of 40 walks so after putting in all the blocks of flats, complexes,terrain the figure they come out with was 40 again. So jog on Back to the Drawing board. P S. We aint signed off phase two yet.