For 60% on the first wave substitute 25-30% ;
For 18% requiring IPS substitute 30%.
Hope that helps. For clarification this is a typical DO operating as a satellite for a feeder WSM equipped DO (as most will be in future)
Can't stress enough that the amount of IPS has increased after the introduction of sequencing tech. and more than negates the prep time saving
Take it or leave it folks ,but you will all see for yourselves soon enough,so I did warn you