https://www.cwu.org/ltb/ltb-163-25-firs ... n-phase-2/
ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
LTB 163/25 – First Mile Integration – Phase 2
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32401
- Joined: 07 Aug 2006, 03:19
- Gender: Male
LTB 163/25 – First Mile Integration – Phase 2
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
menditsa
- Posts: 361
- Joined: 22 Jun 2024, 08:06
- Gender: Male
Re: LTB 163/25 – First Mile Integration – Phase 2
What a FU***G Shambles, 4 meters LOL LOL LOL
-
Smoothbackground
- Posts: 1225
- Joined: 21 Sep 2023, 20:01
- Gender: Female
Re: LTB 163/25 – First Mile Integration – Phase 2
A 4-metre item needs an L4 van! We have only one such van in our office.
-
TopperGas
- Posts: 2828
- Joined: 13 Feb 2021, 22:46
- Gender: Male
Re: LTB 163/25 – First Mile Integration – Phase 2
"Collections make up 8-9% of a driver’s total daily stops"
What are they going to get from RM in return?
What are they going to get from RM in return?