ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
Maximum outdoor work
-
gilbwhite
- Posts: 3
- Joined: 22 Feb 2010, 21:21
- Gender: Male
Maximum outdoor work
Please can anyone let me know if there is any agreement to the maximum number of hours of outdoor work in delivery ? I work 39 hours. Our office has not yet had the park and loop revision, so delivery spans are still 3.5 hours which is fine. However I have been told instead of double prepping and ISP sorting, I will be out delivering packets, which I would prefer not to do. Please post any agreement if there is one.
-
DGP1
- Posts: 15551
- Joined: 07 Jun 2007, 20:39
- Gender: Male
- Location: Terminus
Re: Maximum outdoor work
There is no outdoor maximum just your contracted hours (there's a link to it in the downloads section somewhere).
And can I ask, how are you working a 39hr week when you haven't done a revision?
And can I ask, how are you working a 39hr week when you haven't done a revision?
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
-
gilbwhite
- Posts: 3
- Joined: 22 Feb 2010, 21:21
- Gender: Male
Re: Maximum outdoor work
ok, thanks for your help. Our office hasnt had a full revision to include park and loop yet, as is has been postponed, but we do have sequenced mail and I guess a mini revision to include the 39 hrs and hybrid duties when we had a resign.
-
BELIAL
- Posts: 6758
- Joined: 15 Jun 2007, 17:33
- Gender: Female
- Location: Nowhere
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32787
- Joined: 07 Aug 2006, 03:19
- Gender: Male
Re: Maximum outdoor work
It's 3:30 hrs with a bag over your shoulder,no more.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
DGP1
- Posts: 15551
- Joined: 07 Jun 2007, 20:39
- Gender: Male
- Location: Terminus
Re: Maximum outdoor work
But he'll be out in a van doing packets so that time limit doesn't apply.POSTMAN wrote:It's 3:30 hrs with a bag over your shoulder,no more.
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32787
- Joined: 07 Aug 2006, 03:19
- Gender: Male
Re: Maximum outdoor work
Yep,realised that afterwards,have been looking for something in downloads.DGP1 wrote:But he'll be out in a van doing packets so that time limit doesn't apply.POSTMAN wrote:It's 3:30 hrs with a bag over your shoulder,no more.
Chances are though as well they may try to sneak in more calls to take them over the 3:30.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
BELIAL
- Posts: 6758
- Joined: 15 Jun 2007, 17:33
- Gender: Female
- Location: Nowhere
Re: Maximum outdoor work
Scrap the 3.5 hr span - joint agreement claims this is purely an enabler for innovative attendance patterns.
In practice RM use it as an enabler for cutting hours/duties/jobs without the slightest intention of meeting employees "aspirations". Now all walks are "no longer equal cos the union agreed it, seniority is obviously a thing of the past, cos PT walks ain't as long as FT walks" sic
Time to step up to the mark HQ?
In practice RM use it as an enabler for cutting hours/duties/jobs without the slightest intention of meeting employees "aspirations". Now all walks are "no longer equal cos the union agreed it, seniority is obviously a thing of the past, cos PT walks ain't as long as FT walks" sic
Time to step up to the mark HQ?
Bye
-
heapsy
- Posts: 2972
- Joined: 02 Jun 2007, 23:40
- Gender: Male
- Location: Drinking with Gangsters
Re: Maximum outdoor work
Quite right Belial. In our office we have both HCT and shared vans. The walks are all different lengths and totally mismatched. Everyone on 5 day duties, no 9 day fortnights, 4 day working etc. The HCT duties vary greatly, some seem to go on forever. With the shared van duties we have a full timer with a part timer, so many of the full timers were bypassed when it came to seniority, as they could not be buddied with another F/timer. we have lads who have 9/10 years service and have just about managed to get a rotation duty or leave reserve place. Not much for all those years of service. The whole thing, in my opinion, was to sideline the union, its members, and rail road RM policy through the back door.BELIAL wrote:Scrap the 3.5 hr span - joint agreement claims this is purely an enabler for innovative attendance patterns.
In practice RM use it as an enabler for cutting hours/duties/jobs without the slightest intention of meeting employees "aspirations". Now all walks are "no longer equal cos the union agreed it, seniority is obviously a thing of the past, cos PT walks ain't as long as FT walks" sic
Time to step up to the mark HQ?
-
Lincox
- EX ROYAL MAIL
- Posts: 3485
- Joined: 09 Jan 2008, 18:07
- Gender: Male
Re: Maximum outdoor work
There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
-
heapsy
- Posts: 2972
- Joined: 02 Jun 2007, 23:40
- Gender: Male
- Location: Drinking with Gangsters
Re: Maximum outdoor work
Interesting, even our rep says there isn't a limit on this. Will be taking it up with him ASAP. Cheers.Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32787
- Joined: 07 Aug 2006, 03:19
- Gender: Male
Re: Maximum outdoor work
That was what I was looking for earlier in the thread,but I can't find the fecking thing.Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
DGP1
- Posts: 15551
- Joined: 07 Jun 2007, 20:39
- Gender: Male
- Location: Terminus
Re: Maximum outdoor work
FT is usually good for finding these thingsPOSTMAN wrote:That was what I was looking for earlier in the thread,but I can't find the fecking thing.Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
-
Lincox
- EX ROYAL MAIL
- Posts: 3485
- Joined: 09 Jan 2008, 18:07
- Gender: Male
Re: Maximum outdoor work
It comes under Span Indicator Tool on Page 2 of downloads.
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: Maximum outdoor work
http://www.royalmailchat.co.uk/communit ... an#p408316" onclick="window.open(this.href);return false;
good times, bad times you know I've had my share