dingo wrote: However in the Gatwick and the Bristol trial all machine mail is walk sequenced that includes the work which clears a mail centre at 4 .40 and normally arrives in delivery offices for IPS sorting. Hence why Royal Mail are calculating 20% loss of work to a delivery office.
Don't know if it's possible but I think you would find it very illuminating if you could manage to observe first hand the passage of mech mail through a trial area pipeline. 20% work reduction is simply yet another RM fantasy figure.
Firstly not all machine mail is walk sequenced a large percentage still arrives as walksorted ( true this could be addressed with later start times).
Secondly the volume of mail requiring IPS has shot up by around 20% since the advent of the sequencing trials. You are faced with the bizarre situation of walksorted mail being fed into sequencing machines only for a large percentage of that previously walk sorted mail to be rejected and then shipped out as mixed trays requiring IPS. I'm sure a helpful compact sequence operator could let you know just what % of walksorted mail is rejected . RM madness ,you bolt on an extra mech process ,3-4 runs and end up with less sorted mail than before ,all for minimal 5-10 mins prep time saving.
Where this 20% think of a number thing comes from, search me. If I had to guess I would say that whoever signed up for these new machines failed to think it through and got taken to the cleaners. Looks to me like they want the workforce to sweat blood to cover up their monumental cock up.