TAKING CSS MACHINES OUT

Post by transporter03 »

Please correct me if I'm wrong but does this mean that we will revert back to sorting the mech mail in the original way ?.
I appreciate that we don't get the same amount as we used to do but if they are going to add possibly a sixth to each delivery surely this will slow down the indoor process .That's before you take into consideration the extra d2d's that will need prepping. There is a lot of talk about adding to the outdoor workload but no mention of the indoor aspect. A York full of Chinese packets takes some getting through as anyone who walk sorts will tell you !.For once thank heavens for a bit of banter with your colleagues to get you through it all.
Phantom
Posts: 1234
Joined: 27 Dec 2007, 18:17
Gender: Female
Location: New York

TAKING CSS MACHINES OUT

Post by Phantom »

Mail will revert back to either coding bundles or manual sort.
CUT OFF!!!
Seymour Buts
Posts: 1148
Joined: 22 Jun 2017, 20:17
Gender: Male

TAKING CSS MACHINES OUT

Post by Seymour Buts »

Css machines? Is that what sequences the mail? Why are they taking them away?
postslippete
Posts: 4198
Joined: 14 Jul 2014, 16:27
Gender: Male

TAKING CSS MACHINES OUT

Post by postslippete »

So they've spent millions investing in these CSS machines and training OPs to run them, and now, they want to do away with them?

Surely what they will save on the swings (by not employing CSS operators); they will lose on the roundabouts (by having more bodies on the DO shop floor to sort the mail) :hmmmm
On the face of it, shareholder value is the dumbest idea in the world.
transporter03
Posts: 34
Joined: 03 Oct 2017, 18:24
Gender: Male

TAKING CSS MACHINES OUT

Post by transporter03 »

Seymour Buts wrote:Css machines? Is that what sequences the mail? Why are they taking them away?
Yes you are right that these are the machines which sequence the mail.
In our office we have been told that due to falling letter mail volumes they are no longer viable. As a consequence the 3 which we have will be removed at some point this year. My guess is it will be sooner rather than later. Rumour has it that one of our smaller neighbouring delivery offices will then move in with us using the space vacated by the machines. This will leave another piece of silverware for Rico + co to sell off !.
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12194
Joined: 12 Nov 2008, 17:03
Gender: Male

TAKING CSS MACHINES OUT

Post by SpacePhoenix »

transporter03 wrote:
Seymour Buts wrote:Css machines? Is that what sequences the mail? Why are they taking them away?
Yes you are right that these are the machines which sequence the mail.
In our office we have been told that due to falling letter mail volumes they are no longer viable. As a consequence the 3 which we have will be removed at some point this year. My guess is it will be sooner rather than later. Rumour has it that one of our smaller neighbouring delivery offices will then move in with us using the space vacated by the machines. This will leave another piece of silverware for Rico + co to sell off !.
MCs can also sequence mail on their IMPs and iLSMs though in many MCs some of them will be decommissioned and removed to make space for the new PSMs so there's a good chance that some DOs are going to start to get their mail later as there'll be less machines available to sequence the mail. Our local MPU got reverted back to a normal DO years ago
k979aaa
Posts: 12578
Joined: 03 Sep 2007, 19:14
Gender: Male
Location: THE NORTH

TAKING CSS MACHINES OUT

Post by k979aaa »

Well letters are out packets are in so says the man from Hamburg but has residency in a Swiss canton employed by RM yet pays no TAX over here!
Thailand1
Posts: 66
Joined: 14 Jul 2019, 06:38
Gender: Male

TAKING CSS MACHINES OUT

Post by Thailand1 »

Hi All

The much will still get sequenced at the Mail Centres but will probably be 1st wave only......The 2nd wave albeit a smaller quantity will be walksort only ie not to frame.
Thailand1
Posts: 66
Joined: 14 Jul 2019, 06:38
Gender: Male

TAKING CSS MACHINES OUT

Post by Thailand1 »

Sorry should be the Mail* will still get sequenced.
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12194
Joined: 12 Nov 2008, 17:03
Gender: Male

TAKING CSS MACHINES OUT

Post by SpacePhoenix »

Thailand1 wrote:Hi All

The much will still get sequenced at the Mail Centres but will probably be 1st wave only......The 2nd wave albeit a smaller quantity will be walksort only ie not to frame.
Could be an increase in the amount on wave 2 depending on what CSS and iLSM/IMP capacity the MCs have. It sounds like a good few MCs are going to have 1 or 2 iLSMs removed to make room for PSMs so they'll have a reduced capacity for running mech mail
Binsey
Posts: 390
Joined: 14 Aug 2015, 17:33
Gender: Male

TAKING CSS MACHINES OUT

Post by Binsey »

postslippete wrote:So they've spent millions investing in these CSS machines and training OPs to run them, and now, they want to do away with them?

Surely what they will save on the swings (by not employing CSS operators); they will lose on the roundabouts (by having more bodies on the DO shop floor to sort the mail) :hmmmm

When the Employer initially purchased the CSS machines in 2005 it was seen as a 10 year project (in and out)so they have had a least 15 year use.

More worryingly it appears the CSS Removal Stage 1,2,3 disagreements around the country are going too be the first flashpoints with EA.
Nick b
MAIL CENTRES/PROCESSING
Posts: 32
Joined: 22 Jul 2017, 21:57
Gender: Male

TAKING CSS MACHINES OUT

Post by Nick b »

The mail will still be done by remaining CSS office’s in the area, it is those with just 2 machines in their office that will be closed.
However, the personnel who man the machines will still receive night allowance plus machine allowance up to 5 years after their jobs have gone which makes any great savings questionable.
pinstripe
Posts: 2474
Joined: 25 May 2007, 16:42
Gender: Male
Location: 2 left turns from reality

TAKING CSS MACHINES OUT

Post by pinstripe »

Nick b wrote: However, the personnel who man the machines will still receive night allowance plus machine allowance up to 5 years after their jobs have gone which makes any great savings questionable.
I thought allowances were only protected for 3 years? Still, better than an instant 25% wage cut straight away.
Tman
Posts: 4145
Joined: 21 Oct 2007, 09:57

TAKING CSS MACHINES OUT

Post by Tman »

Nick b wrote: However, the personnel who man the machines will still receive night allowance plus machine allowance up to 5 years after their jobs have gone which makes any great savings questionable.
Not at all. There's the reduction in Engineering workload hours (maintenance, repairs, etc) plus a reduction in the spares budget and spares holdings, any of which would dwarf old Bert's machine allowance.
Sugar
EX ROYAL MAIL
Posts: 431
Joined: 08 Jul 2007, 07:57
Gender: Female

TAKING CSS MACHINES OUT

Post by Sugar »

Tman wrote:
Nick b wrote: However, the personnel who man the machines will still receive night allowance plus machine allowance up to 5 years after their jobs have gone which makes any great savings questionable.
Not at all. There's the reduction in Engineering workload hours (maintenance, repairs, etc) plus a reduction in the spares budget and spares holdings, any of which would dwarf old Bert's machine allowance.
/\/\/\/\/\ as he says.

Plus you have travelling costs for engineers going round all these DO's with CSS machines. The savings on spare parts will be quite significant in the long run and free up huge amounts of storage for any new machines coming in. Plus if they manage to sell off the machines elsewhere instead of just scrapping them they'll recoup a few quid there.

This is probably the start of moving more and more DO's into single units to save on building maintenance and/or rents. Said owned buildings will get sold off for a short term gain.