Post by silver_fox »

I'm sure it' the same in most offices, where everybody who does the deliveries knows some are better than others, yet we are expected to all complete in the same time?

2/3rds of our day is outside on delivery and the only part of the day management is interested in is the 1/3 we are indoors sorting and prepping.

All it would take is a manager come out one day on each job, delivery person does it properly and manager times how long it takes, and makes notes of hazards etc.

Instead all we get it is constant bullying and abuse when we suggest we may have to cut off, how is counting all my letters before I tie up any way of working out if I have enough time? And how is it possible for a manager to say he's counted them all in literally 5 minutes?
Acca Dacca
Posts: 3220
Joined: 16 Aug 2009, 17:13
Gender: Male

Re: Why don't RM ever test walks?

Post by Acca Dacca »

Why do you think?
If you tolerate this, then your paid break will be next
IcanthelpthewayIam
Posts: 4067
Joined: 26 May 2009, 13:37
Gender: Male

Re: Why don't RM ever test walks?

Post by IcanthelpthewayIam »

silver_fox wrote:I'm sure it' the same in most offices, where everybody who does the deliveries knows some are better than others, yet we are expected to all complete in the same time?

2/3rds of our day is outside on delivery and the only part of the day management is interested in is the 1/3 we are indoors sorting and prepping.

All it would take is a manager come out one day on each job, delivery person does it properly and manager times how long it takes, and makes notes of hazards etc.

Instead all we get it is constant bullying and abuse when we suggest we may have to cut off, how is counting all my letters before I tie up any way of working out if I have enough time? And how is it possible for a manager to say he's counted them all in literally 5 minutes?
he doesnt count each letter, he is counting spaces in the frame so he can work out what percentage of call rate you have, thats why it only takes 5 min, if its over what the duties were planned at he should assume you should be over and if its under (which it always seems to be according to them) it "should" take less
arnold cheshire
Posts: 5309
Joined: 14 Oct 2010, 21:28
Gender: Male
Location: england

Re: Why don't RM ever test walks?

Post by arnold cheshire »

silver_fox wrote:I'm sure it' the same in most offices, where everybody who does the deliveries knows some are better than others, yet we are expected to all complete in the same time?

2/3rds of our day is outside on delivery and the only part of the day management is interested in is the 1/3 we are indoors sorting and prepping.

All it would take is a manager come out one day on each job, delivery person does it properly and manager times how long it takes, and makes notes of hazards etc.

Instead all we get it is constant bullying and abuse when we suggest we may have to cut off, how is counting all my letters before I tie up any way of working out if I have enough time? And how is it possible for a manager to say he's counted them all in literally 5 minutes?
half of the day outside for the postie in our office :thumbup
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: Why don't RM ever test walks?

Post by fishtank »

We've had walks tested during the revision process.
I sat in on a 1 to 1 with a member and the planner,the member said the duty was an hour over,the planner disagreed as they do and it went backwards and forwards for 10 minutes so in the end we agreed to live test it.
Two managers did the duty,the planner timed it and the member and I sat in the van talking about football.
The member was wrong,It wasn't an hour over...it was an hour and forty minutes over.
The drive back to the office was very subdued,I thought at one point the managers were going to make the planner walk back.
good times, bad times you know I've had my share
UnhappyGremlin
Posts: 2685
Joined: 18 May 2012, 20:49
Gender: Male
Location: Hiding

Re: Why don't RM ever test walks?

Post by UnhappyGremlin »

fishtank wrote:We've had walks tested during the revision process.
I sat in on a 1 to 1 with a member and the planner,the member said the duty was an hour over,the planner disagreed as they do and it went backwards and forwards for 10 minutes so in the end we agreed to live test it.
Two managers did the duty,the planner timed it and the member and I sat in the van talking about football.
The member was wrong,It wasn't an hour over...it was an hour and forty minutes over.
The drive back to the office was very subdued,I thought at one point the managers were going to make the planner walk back.
The planner was right.......though he was still wrong too.
Sometimes, I wish I wasn't a Rep.
north london driver
Posts: 560
Joined: 18 Aug 2010, 21:51
Gender: Male

Re: Why don't RM ever test walks?

Post by north london driver »

UnhappyGremlin wrote:
fishtank wrote:We've had walks tested during the revision process.
I sat in on a 1 to 1 with a member and the planner,the member said the duty was an hour over,the planner disagreed as they do and it went backwards and forwards for 10 minutes so in the end we agreed to live test it.
Two managers did the duty,the planner timed it and the member and I sat in the van talking about football.
The member was wrong,It wasn't an hour over...it was an hour and forty minutes over.
The drive back to the office was very subdued,I thought at one point the managers were going to make the planner walk back.
The planner was right.......though he was still wrong too.
managers are the planners the all thick so what do you expect, managers want the revision in to make savings nothing else
as long as they get their bonus they are not intrested.
meweavy
Posts: 473
Joined: 10 May 2007, 11:07

Re: Why don't RM ever test walks?

Post by meweavy »

2 duties were tested before the revisions, both went over by 2 hours, the duties came in without any change.
Most duties dont work, none will be tested, management were going down the performance route at the beginning until everyone asked to be walk tested, management backed off because they knew the duties dont work.
Now its count the slots and leave the packets if need be.
IcanthelpthewayIam
Posts: 4067
Joined: 26 May 2009, 13:37
Gender: Male

Re: Why don't RM ever test walks?

Post by IcanthelpthewayIam »

meweavy wrote:2 duties were tested before the revisions, both went over by 2 hours, the duties came in without any change.
Most duties dont work, none will be tested, management were going down the performance route at the beginning until everyone asked to be walk tested, management backed off because they knew the duties dont work.
Now its count the slots and leave the packets if need be.
you should now say you thought streaming of mail was not allowed (normally only when they say take out 1st class only, but it is a vaild comment if they are saying leave packets) ask them to put it in writing that packets are to be left in
Jimbobb
Posts: 37
Joined: 18 Mar 2013, 16:56
Gender: Male

Re: Why don't RM ever test walks?

Post by Jimbobb »

fishtank wrote:We've had walks tested during the revision process.
I sat in on a 1 to 1 with a member and the planner,the member said the duty was an hour over,the planner disagreed as they do and it went backwards and forwards for 10 minutes so in the end we agreed to live test it.
Two managers did the duty,the planner timed it and the member and I sat in the van talking about football.
The member was wrong,It wasn't an hour over...it was an hour and forty minutes over.
The drive back to the office was very subdued,I thought at one point the managers were going to make the planner walk back.
Was the walk altered?
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: Why don't RM ever test walks?

Post by fishtank »

Jimbobb wrote:Was the walk altered?
Yes.
If it hadn't been altered the revision would have stopped there.
Quite a few of our walks were reduced after the 1 to 1 meetings.
In my opinion Pegasus is a complete waste of time,usually you would say s**t in/s**t out but in the case of Pegasus it doesn't matter what you put in the result is always s**t,you end up having to make so many manual adjustments that it would have been quicker to plan the walks yourself.
good times, bad times you know I've had my share
ronpetetrevchris
Posts: 503
Joined: 30 Oct 2007, 17:55

Re: Why don't RM ever test walks?

Post by ronpetetrevchris »

fishtank wrote:
Jimbobb wrote:Was the walk altered?
Yes.
If it hadn't been altered the revision would have stopped there.
Quite a few of our walks were reduced after the 1 to 1 meetings.
In my opinion Pegasus is a complete waste of time,usually you would say s**t in/s**t out but in the case of Pegasus it doesn't matter what you put in the result is always s**t,you end up having to make so many manual adjustments that it would have been quicker to plan the walks yourself.
:Applause :Applause
sparky80
Posts: 15
Joined: 07 Mar 2010, 12:34
Gender: Male

Re: Why don't RM ever test walks?

Post by sparky80 »

Me and my partner got tested on a delivery with a planner. We went nearly 2 hours over our time, doing the delivery how RM expect us to, and the planner went back to the office and told the dom it was fine! Was then left to 2 panickers who come in early and don't have their meal breaks to complete it!
redandblue
Posts: 104
Joined: 24 Jul 2013, 21:42
Gender: Male

Re: Why don't RM ever test walks?

Post by redandblue »

silver_fox wrote:I'm sure it' the same in most offices, where everybody who does the deliveries knows some are better than others, yet we are expected to all complete in the same time?

2/3rds of our day is outside on delivery and the only part of the day management is interested in is the 1/3 we are indoors sorting and prepping.

All it would take is a manager come out one day on each job, delivery person does it properly and manager times how long it takes, and makes notes of hazards etc.

Instead all we get it is constant bullying and abuse when we suggest we may have to cut off, how is counting all my letters before I tie up any way of working out if I have enough time? And how is it possible for a manager to say he's counted them all in literally 5 minutes?
Unless there is a Coffee machine somewhere on your delivery, you have no chance.
They can't be expected to go without a Caffine fix for 4 hours.
Good god man, how long have you been in RM?
Postie45
Posts: 2160
Joined: 21 Aug 2012, 23:05
Gender: Male

Re: Why don't RM ever test walks?

Post by Postie45 »

fishtank wrote:
Jimbobb wrote:Was the walk altered?
Yes.
If it hadn't been altered the revision would have stopped there.
Quite a few of our walks were reduced after the 1 to 1 meetings.
In my opinion Pegasus is a complete waste of time,usually you would say s**t in/s**t out but in the case of Pegasus it doesn't matter what you put in the result is always s**t,you end up having to make so many manual adjustments that it would have been quicker to plan the walks yourself.
i know a little bit about computers, and if RM think any program such as Pegasus can work out how long a walk should take accurately they are idiots ! Theres so many factors it doesnt take into account so the whole thing is pointless !