ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
FLOW
-
TrueBlueTerrier
- FORUM ADMINISTRATOR
- Posts: 72727
- Joined: 30 Dec 2006, 10:29
- Gender: Male
- Location: On my couch
Re: FLOW
All of them, Crap always FLOWS down hill.Puppetmaster wrote:Is any office in the Country using Flow ?
I think its part of World Class Mailing so there may be something in the downloads section if you are looking for specific details/information.
All post by me in Green are Admin Posts.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
Any post in any other colour is my own responsibility.
If you like a news story I posted please click the link to show support Any news stories you can't post - PM me with a link
My sharing of news articles should not be interpreted as an endorsement or condemnation of any particular viewpoint or the issues presented. I share them solely for informational purposes.
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: FLOW
Everything you (didn't) want to know about Indoor Methods/Flow in one page....
http://www.cwu.org/indoor-work-method-guidance.html" onclick="window.open(this.href);return false;
Task 09e - DP Indoor work method improvement Gantt Chart (Feb 12)
Task 09f - DP Indoor Scope and Assets
Task 14a - DP Indoor Work Method improvement start up Meeting Agenda
Task 14b - DP Delivery Office Site Inspection
Task 14c - DP Indoor Method Improvement Agenda for Workshop
Task 14d - DP Indoor Work Method Improvement Principles Overview v3
Task 14e - DP Safety Concurrence - Indoor Work Method Improvement Final
Task 14f - DP Royal Mail & CWU Indoor Methods Guidance V1
Task 15a - DP Excel Floor Planning Tool to Use (C)
Task 15c - DP How to Use the Excel Floorplanning Tool Guide
Task 16 - DP IWT Version 7 4 Upgrade_Quick Reference Guide
Task 20a - DP Sorting Frame Requirement Indicator Guidelines v2.0
Task 20b - DP Sorting Frame Requirement Indicator Master v2.0
Task 22a - DP Floorplanning Checklist v2
Task 22b - DP Indoor work method improvement space standards v1.4
Task 22c - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 22d - DP Unit Risk Assessment Review
Task 22f - DP Indoor Pre Method Improvment Photograph List
Task 23a DP Excel Floor Planning Tool to Use
Task 23b - DP Indoor work method improvement space standards v1.4 Final
Task 31a - DP Unit Indoor work methods layout Sign off [CA]
Task 31b - DP SAC1 v2.5 (for building and Refurbishment work) [CA]
Task 45a - DP Measurement and Display Slides [R]
Task 45b - DP Tracked and SD Measurement and Display chart [C]
Task 45c - DP Manual Measurement and Display Boards_v1.0 (C)
Task 45d - DP Where to find Planned Actual Performance data within IWT for Display v1.0 [R]
Task 45e - DP Daily Huddles Guidance [R]
Task 46a - DP IPS Fillets - Best Practice Examples [R]
Task 47a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 47b - DP York Safe System Of Work v2.3 [R]
Task 47c - DP Training Frame-Trolley1.1 [R]
Task 47d - DP Work Equipment Risk Assessment [C]
Task 48a - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 48b - DP Workplace Risk Assessmemt Manual WP1 [C]
Task 48c - DP First Aid Risk Assessment v 2.3 (C)
Task 48d - DP Fire Risk Assessment Guidance [R]
Task 48e - DP Fire Risk Assessment Review [C]
Task 65a - DP Delivery Office FM Works Completion sign off [CA]
Task 65b - DP Example Method Statement [R]
Task 65c - DP Job completion sheet vers 0.2 (R)
Task 66a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 66b - DP York Safe System Of Work v2.3 [R]
Task 66c - DP Training Frame-Trolley1.1 [R]
Task 106a - DP Indoor work method PER [CA]
Task 106b - DP Final Layout Changes [R]
Task 106c - DP SAC3 Unit Post deployment Q set Feb Final
Task 144c - DP Post Indoor Flow Photograph List [CA]
Task 150b - DP Indoor Flow Layout Deployed Sign off [CA]

http://www.cwu.org/indoor-work-method-guidance.html" onclick="window.open(this.href);return false;
Task 09e - DP Indoor work method improvement Gantt Chart (Feb 12)
Task 09f - DP Indoor Scope and Assets
Task 14a - DP Indoor Work Method improvement start up Meeting Agenda
Task 14b - DP Delivery Office Site Inspection
Task 14c - DP Indoor Method Improvement Agenda for Workshop
Task 14d - DP Indoor Work Method Improvement Principles Overview v3
Task 14e - DP Safety Concurrence - Indoor Work Method Improvement Final
Task 14f - DP Royal Mail & CWU Indoor Methods Guidance V1
Task 15a - DP Excel Floor Planning Tool to Use (C)
Task 15c - DP How to Use the Excel Floorplanning Tool Guide
Task 16 - DP IWT Version 7 4 Upgrade_Quick Reference Guide
Task 20a - DP Sorting Frame Requirement Indicator Guidelines v2.0
Task 20b - DP Sorting Frame Requirement Indicator Master v2.0
Task 22a - DP Floorplanning Checklist v2
Task 22b - DP Indoor work method improvement space standards v1.4
Task 22c - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 22d - DP Unit Risk Assessment Review
Task 22f - DP Indoor Pre Method Improvment Photograph List
Task 23a DP Excel Floor Planning Tool to Use
Task 23b - DP Indoor work method improvement space standards v1.4 Final
Task 31a - DP Unit Indoor work methods layout Sign off [CA]
Task 31b - DP SAC1 v2.5 (for building and Refurbishment work) [CA]
Task 45a - DP Measurement and Display Slides [R]
Task 45b - DP Tracked and SD Measurement and Display chart [C]
Task 45c - DP Manual Measurement and Display Boards_v1.0 (C)
Task 45d - DP Where to find Planned Actual Performance data within IWT for Display v1.0 [R]
Task 45e - DP Daily Huddles Guidance [R]
Task 46a - DP IPS Fillets - Best Practice Examples [R]
Task 47a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 47b - DP York Safe System Of Work v2.3 [R]
Task 47c - DP Training Frame-Trolley1.1 [R]
Task 47d - DP Work Equipment Risk Assessment [C]
Task 48a - DP SAC3 Unit pre deployemnt Q set Feb Final 2012
Task 48b - DP Workplace Risk Assessmemt Manual WP1 [C]
Task 48c - DP First Aid Risk Assessment v 2.3 (C)
Task 48d - DP Fire Risk Assessment Guidance [R]
Task 48e - DP Fire Risk Assessment Review [C]
Task 65a - DP Delivery Office FM Works Completion sign off [CA]
Task 65b - DP Example Method Statement [R]
Task 65c - DP Job completion sheet vers 0.2 (R)
Task 66a - DP SSOW IPS Backless FrameTrolley V1.5 Final [R]
Task 66b - DP York Safe System Of Work v2.3 [R]
Task 66c - DP Training Frame-Trolley1.1 [R]
Task 106a - DP Indoor work method PER [CA]
Task 106b - DP Final Layout Changes [R]
Task 106c - DP SAC3 Unit Post deployment Q set Feb Final
Task 144c - DP Post Indoor Flow Photograph List [CA]
Task 150b - DP Indoor Flow Layout Deployed Sign off [CA]
good times, bad times you know I've had my share
-
clashcityrocker
- Posts: 16689
- Joined: 22 Sep 2009, 13:50
- Gender: Male
- Location: strummerville
Re: FLOW
Is the DP for Double Penetration?
Shafted indoors/shafted outdoors?
Shafted indoors/shafted outdoors?
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
-
fishtank
- Posts: 19732
- Joined: 28 Sep 2007, 17:22
- Gender: Male
Re: FLOW
Define work?Puppetmaster wrote:Silly Question ,does it work ?
Does looking at the way things are done in an office that probably hasn't changed since 1964,moving certain parts of the office to suit new working methods and reducing pointless wandering about improve the office's EP?
Probably.
Will management balls it up?
Definitely.
Will it eventually pay for the initial vast costs in ongoing savings.
Unlikely when the cabinets alone come in at £250 a pop for 4 bits of MDF screwed together.
My advice from a member's point of view is get what you can from it.
It's new and shiny so the budget is practically unlimited therefore with a little imagination and a bullshit artist for a rep it's relatively simple to incorporate a new pool table into the Indoor Flow process.
good times, bad times you know I've had my share
-
clashcityrocker
- Posts: 16689
- Joined: 22 Sep 2009, 13:50
- Gender: Male
- Location: strummerville
Re: FLOW
The idea is you put your resources where you need them most so you have your supersorters on IPS and your super preppers on frame prep and the dregs of the office become super porters.Puppetmaster wrote:Silly Question ,does it work ? and how does not preping your own round but others improve things?
The great thing about having someone else prep your frame is if you have mail for a top decker and you don't fancy the walk, you just mark it missort......
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
-
centenaryman
- Posts: 512
- Joined: 12 Jan 2010, 20:31
- Gender: Male
Re: FLOW
clashcityrocker wrote:The idea is you put your resources where you need them most so you have your supersorters on IPS and your super preppers on frame prep and the dregs of the office become super porters.Puppetmaster wrote:Silly Question ,does it work ? and how does not preping your own round but others improve things?
The great thing about having someone else prep your frame is if you have mail for a top decker and you don't fancy the walk, you just mark it missort......
weve found you dont have worry about wether u fancy doing it or not,,,,cos since we havnt prepped our own walks for a while there littered with "loads" of missorts and plenty of them arnt even for your own walk,,,,crazy way of working
-
chooch
- Posts: 323
- Joined: 21 Jul 2010, 13:14
- Gender: Male
Re: FLOW
'your supersorters on IPS and your super preppers on frame prep and the dregs of the office become super porters.'clashcityrocker wrote:The idea is you put your resources where you need them most so you have your supersorters on IPS and your super preppers on frame prep and the dregs of the office become super porters.Puppetmaster wrote:Silly Question ,does it work ? and how does not preping your own round but others improve things?
The great thing about having someone else prep your frame is if you have mail for a top decker and you don't fancy the walk, you just mark it missort......
or just divide the work-force by 3 !!.
'Management' the idea is... but that means you have to...
' You know what? let's just say 1st wave, 2nd wave, 3rd.. .'
( but 3rd wave still haven't gone through revision after everyone else did 3 months ago.. !! )