Please can anyone let me know if there is any agreement to the maximum number of hours of outdoor work in delivery ? I work 39 hours. Our office has not yet had the park and loop revision, so delivery spans are still 3.5 hours which is fine. However I have been told instead of double prepping and ISP sorting, I will be out delivering packets, which I would prefer not to do. Please post any agreement if there is one.
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: Maximum outdoor work

Post by DGP1 »

There is no outdoor maximum just your contracted hours (there's a link to it in the downloads section somewhere).

And can I ask, how are you working a 39hr week when you haven't done a revision?
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
gilbwhite
Posts: 3
Joined: 22 Feb 2010, 21:21
Gender: Male

Re: Maximum outdoor work

Post by gilbwhite »

ok, thanks for your help. Our office hasnt had a full revision to include park and loop yet, as is has been postponed, but we do have sequenced mail and I guess a mini revision to include the 39 hrs and hybrid duties when we had a resign.
BELIAL
Posts: 6758
Joined: 15 Jun 2007, 17:33
Gender: Female
Location: Nowhere

Re: Maximum outdoor work

Post by BELIAL »

:wink:
Bye
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32787
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Maximum outdoor work

Post by POSTMAN »

It's 3:30 hrs with a bag over your shoulder,no more.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: Maximum outdoor work

Post by DGP1 »

POSTMAN wrote:It's 3:30 hrs with a bag over your shoulder,no more.
But he'll be out in a van doing packets so that time limit doesn't apply.
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32787
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Maximum outdoor work

Post by POSTMAN »

DGP1 wrote:
POSTMAN wrote:It's 3:30 hrs with a bag over your shoulder,no more.
But he'll be out in a van doing packets so that time limit doesn't apply.
Yep,realised that afterwards,have been looking for something in downloads.
Chances are though as well they may try to sneak in more calls to take them over the 3:30.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
BELIAL
Posts: 6758
Joined: 15 Jun 2007, 17:33
Gender: Female
Location: Nowhere

Re: Maximum outdoor work

Post by BELIAL »

Scrap the 3.5 hr span - joint agreement claims this is purely an enabler for innovative attendance patterns.
In practice RM use it as an enabler for cutting hours/duties/jobs without the slightest intention of meeting employees "aspirations". Now all walks are "no longer equal cos the union agreed it, seniority is obviously a thing of the past, cos PT walks ain't as long as FT walks" sic
Time to step up to the mark HQ?
Bye
heapsy
Posts: 2972
Joined: 02 Jun 2007, 23:40
Gender: Male
Location: Drinking with Gangsters

Re: Maximum outdoor work

Post by heapsy »

BELIAL wrote:Scrap the 3.5 hr span - joint agreement claims this is purely an enabler for innovative attendance patterns.
In practice RM use it as an enabler for cutting hours/duties/jobs without the slightest intention of meeting employees "aspirations". Now all walks are "no longer equal cos the union agreed it, seniority is obviously a thing of the past, cos PT walks ain't as long as FT walks" sic
Time to step up to the mark HQ?
Quite right Belial. In our office we have both HCT and shared vans. The walks are all different lengths and totally mismatched. Everyone on 5 day duties, no 9 day fortnights, 4 day working etc. The HCT duties vary greatly, some seem to go on forever. With the shared van duties we have a full timer with a part timer, so many of the full timers were bypassed when it came to seniority, as they could not be buddied with another F/timer. we have lads who have 9/10 years service and have just about managed to get a rotation duty or leave reserve place. Not much for all those years of service. The whole thing, in my opinion, was to sideline the union, its members, and rail road RM policy through the back door.
Lincox
EX ROYAL MAIL
Posts: 3485
Joined: 09 Jan 2008, 18:07
Gender: Male

Re: Maximum outdoor work

Post by Lincox »

There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
heapsy
Posts: 2972
Joined: 02 Jun 2007, 23:40
Gender: Male
Location: Drinking with Gangsters

Re: Maximum outdoor work

Post by heapsy »

Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
Interesting, even our rep says there isn't a limit on this. Will be taking it up with him ASAP. Cheers.
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32787
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Maximum outdoor work

Post by POSTMAN »

Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
That was what I was looking for earlier in the thread,but I can't find the fecking thing.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: Maximum outdoor work

Post by DGP1 »

POSTMAN wrote:
Lincox wrote:There are maximum time limits dependant on delivery method.i.e walking, cycling, hct, van and LWT. These can be found in the downloads.
That was what I was looking for earlier in the thread,but I can't find the fecking thing.
FT is usually good for finding these things :nervous
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
Lincox
EX ROYAL MAIL
Posts: 3485
Joined: 09 Jan 2008, 18:07
Gender: Male

Re: Maximum outdoor work

Post by Lincox »

It comes under Span Indicator Tool on Page 2 of downloads.
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: Maximum outdoor work

Post by fishtank »

http://www.royalmailchat.co.uk/communit ... an#p408316" onclick="window.open(this.href);return false;