Tamsky
Posts: 253
Joined: 01 Jul 2007, 13:16
Location: Ayrshire Coast

Infinity and Beyond

Post by Tamsky »

I work in a unit that took 17 days strike action in 2009, not only in support of the national union, but also over local issues of perceived bullying by managers. We resolved the local issues with the support of the Outdoor secretary. Others thought the national issues were resolved by the National agreement 2010 and beyond. I was opposed to the Agreement because of the D2D element and because I did not believe that the leopard had changed it's spots. How could we work hand in hand with senior managerial teams that have dragged the service down?.

I was asked yeasterday by a part timer who had stood on the picket line with us full timers when he could expect a full time contact. I was unable to answer him. Despite all the fluffy words in the national agreement RM have reverted to type and the CWU seem unwilling, or unable to challenge this.

Over the last few days various stories are emerging from the top that all is not as it seems. The first rule of fight club is never talk about fight club, the first rule of the CWU seems to be never talk to the members on the ground.

RM have now said that if no savings can be made then no methods revisions will be introduced - What about weight off the shoulder, the tools for the job and manageable workloads and 1 in 4 Saturdays off as a minimum. RM are now saying that they regret making part time staff up to full time since this reduces flexibility - part time staff are more likely to work overtime as required to flex up. What about 75/25 split? RM are now saying that they want to 'support' the Indoor workload Tool with the capacity plan, what about proper and transparent measurement of our indoor work.? RM are now saying that they want to extend the transformation of the service to 2015, what about the promised pay rewards and bonus payments before 2012?.
The CWU have now asked Roger Poole for help in getting RM to respect the Agreement. Watch this space.

I took part in a discussion today over changes at CWU HQ, all the talk was of merging executives, reducing democratic input and cotrol through biennial conferences etc. I have a more radical solution to the cash crisis - What about national officers on OPG pay grades and on week on week off the job. Maybe then I could answer the part timer with some confidence.
Last edited by Tamsky on 09 Mar 2011, 22:19, edited 1 time in total.
kimski1976
Posts: 95
Joined: 31 Aug 2010, 20:57
Gender: Male

Re: Infinity and Beyond

Post by kimski1976 »

these revision are going ahead, period. whether yours is late, it will happen. too much money invested in it. although its compelte bullshit and will not work it is going ahead.
Tamsky
Posts: 253
Joined: 01 Jul 2007, 13:16
Location: Ayrshire Coast

Re: Infinity and Beyond

Post by Tamsky »

The question is whether it is a revision which provides the tools for the job, reducing weight on the shoulder with achieveable workload and delivery spans and achieves one in four Sats off or whether it is a revision based on taking hours out through the Capacity plan and Geo route.

I don't deny we need revisions, but change will only succeed with the consent of the staff.
kevpeters
Posts: 11
Joined: 16 Feb 2010, 19:44
Gender: Male

Re: Infinity and Beyond

Post by kevpeters »

Tamsky wrote:The question is whether it is a revision which provides the tools for the job, reducing weight on the shoulder with achieveable workload and delivery spans and achieves one in four Sats off or whether it is a revision based on taking hours out through the Capacity plan and Geo route.

I don't deny we need revisions, but change will only succeed with the consent of the staff.

I wouldn't bank on them going through, 21 years service, company will be sold then it all starts again.
AnotherLimey
Posts: 751
Joined: 08 Aug 2009, 18:45
Gender: Male

Re: Infinity and Beyond

Post by AnotherLimey »

Quality post Tamsky :Applause

No doubt Dingo and his like will be on soon to say all is fine with the agreement and you and your office are just weak! :roll:
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32784
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Infinity and Beyond

Post by POSTMAN »

RM have now said that if no savings can be made then no methods revisions will be introduced
Well if they won't play then we wont,they aint getting f**k all off of us if we don't get back what the agreement says back.


PS:Don't be a stranger Tam. :Applause
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
joeboy
Posts: 65
Joined: 01 Mar 2010, 17:45
Gender: Male

Re: Infinity and Beyond

Post by joeboy »

hearing now, that Royal Mail, want to pull out of the 2010 agreement, and evr will be offered to the people with low seniority instead of per the national agreement, this job has had it.
skull
Posts: 450
Joined: 15 Nov 2010, 19:31
Gender: Male

Re: Infinity and Beyond

Post by skull »

Tamsky wrote:The question is whether it is a revision which provides the tools for the job, reducing weight on the shoulder with achieveable workload and delivery spans and achieves one in four Sats off or whether it is a revision based on taking hours out through the Capacity plan and Geo route.

I don't deny we need revisions, but change will only succeed with the consent of the staff.


We had the second option and it was a total disaster, we just got " the computer says it is possible , go away " . Finally the planners and managers are showing some respect and have realised that they need us posties onboard and have stressed our input is vital . I really think this second revision will work and in my opinion the new way of working will be a winner for us posties . RM senior management will just have to accept the facts and figures and weep because the 2010 agreement isn't going to deliver the savings they planned upon.
clashcityrocker
Posts: 16685
Joined: 22 Sep 2009, 13:50
Gender: Male
Location: strummerville

Re: Infinity and Beyond

Post by clashcityrocker »

The CWU have now asked Roger Poole for help in getting RM to respect the Agreement.

And what if he can't?
What if they won't?
Does HQ have the stomach for the fight?
Do the members ?

Some units are already on a 39hr week (and have had the Transformation Lump Sums,) while others might not see it until 2015.
The irony being that those offices that won't give them any savings are the very units that are currently under resourced and need the revisions.
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: Infinity and Beyond

Post by fishtank »

A FRESH START
• A radical improvement in relationships at all levels. Developing a culture of common
objectives and aligned interests.
• A shared vision of modernisation in the joint interests of customers, employees and the
company.
• A completely fresh approach to managing local change, including greater support for
local representatives. The focus will be on joint problem solving and practical solutions
rather than disagreement, management imposition and industrial action.
• To build trust and ensure the agreement is honoured the continuing involvement of the
Independent Facilitator and ACAS.
:cuppa

Great post Tamsky...worrying times ahead more so with regards to the last part of your post.
The last thing the CWU needs is further disengagement between members and HQ.
Suicidal for all involved.
good times, bad times you know I've had my share
brothermagrew
Posts: 3015
Joined: 06 Aug 2007, 16:38
Gender: Male
Location: Shares a border with England to the south.

Re: Infinity and Beyond

Post by brothermagrew »

Hope your putting your name forward for Div Rep brother Tamsky :wave
"Today’s workplace has become heartless and soulless. Employees are seen as units of labour, automatons, functionaries, objects for achieving designated tasks, and as costs to be minimised."
Steviea34
Posts: 474
Joined: 10 Apr 2009, 10:44
Gender: Male

Re: Infinity and Beyond

Post by Steviea34 »

We have been told the revision will go ahead, but it cannot worsen the office run rate,
so if it saves hours fine, if it means putting hours in, it wont, simples and yes the area
rep is aware of it. :crazy: :crazy:
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: Infinity and Beyond

Post by fishtank »

Steviea34 wrote:We have been told the revision will go ahead, but it cannot worsen the office run rate,
so if it saves hours fine, if it means putting hours in, it wont, simples and yes the area
rep is aware of it. :crazy: :crazy:
...but it's not about savings stevie.
It's about using the agreed tools and if that means your office needs hours then so be it.
You remember the flannel...don't you?
good times, bad times you know I've had my share
dvbuk55
EX ROYAL MAIL
Posts: 16650
Joined: 02 Jun 2007, 19:17
Gender: Male

Re: Infinity and Beyond

Post by dvbuk55 »

It seems that there is finally a grass roots upsurge in dissatisfaction with the way the union is being managed, long overdue in my opinion. For far too long the leadership have been treating the membership as a cash cow with scant regard to their wishes. It would appear now that even the likes of Dingo realise that things cannot continue as they are if the union is to survive as an independent body.

The TUC also has to shoulder some of the blame as there has been very little in the way of concerted attacks on Government policy especially of the last Labour government.
BELIAL
Posts: 6758
Joined: 15 Jun 2007, 17:33
Gender: Female
Location: Nowhere

Re: Infinity and Beyond

Post by BELIAL »

POSTMAN wrote:
RM have now said that if no savings can be made then no methods revisions will be introduced
Well if they won't play then we wont,they aint getting f**k all off of us if we don't get back what the agreement says back.


PS:Don't be a stranger Tam. :Applause