Hemel dock levellers

Post by Hertsmail »

The dock levellers at the new Hemel site are a joke and surely not fit for purpose with only about an inch of play either side.
graham569
MAIL CENTRES/PROCESSING
Posts: 2
Joined: 29 May 2011, 15:27
Gender: Male

Re: Hemel dock levellers

Post by graham569 »

hi
same problem at all dc,s problem solved by parking 600s correctly on dock then marking dock with high vis tape....not always foolproof but works most times at my voc....make ramps any narrower
then the gaps at the side would be dangerous for the proper trucks that carry 98 yorks....
disheartened
MAIL CENTRES/PROCESSING
Posts: 464
Joined: 12 Jun 2007, 09:14
Gender: Male
Location: Down Sarf

Re: Hemel dock levellers

Post by disheartened »

Hertsmail wrote:The dock levellers at the new Hemel site are a joke and surely not fit for purpose with only about an inch of play either side.
When i back on to the dock,i let the 600 touch the yellow stoppers,then roll forward a couple of inches
dont permissum bastards frendo vos down