all outward and inward thru 1 IMP plan!

A forum for our Mail Centre, Processing and Distribution colleagues.
hubbahubba
MAIL CENTRES/PROCESSING
Posts: 1045
Joined: 24 Jun 2009, 22:02
Gender: Female

all outward and inward thru 1 IMP plan!

Post by hubbahubba »

Managed to find out this week that RM are rolling out new plans for the IMPS so that ALL outward AND inward are put thru on 1 plan,also all postcode destinations will have only ONE residue box(eg PO res,M res LS res etc etc).Dont know if they will be extending the modules or squeezing it all on the current set-up(my MC has IMPS with 160 boxes at mo,but i know they can go up to 240 apparently.Was told this is a National plan,and not just a local thing,starting in around 2 months?!
same as it ever was...
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12007
Joined: 12 Nov 2008, 17:03
Gender: Male

Re: all outward and inward thru 1 IMP plan!

Post by SpacePhoenix »

Sounds like an extension to the three-frame sort but with the selections used for the three-frame sort being applied to the IMP plan. With all the inward stuff going through one plan then it sounds like all DOs in your area will get their letters walk sequenced and anything letters that either the IMP or walk sequencing machine reject will go straight to manual sorting.
hubbahubba
MAIL CENTRES/PROCESSING
Posts: 1045
Joined: 24 Jun 2009, 22:02
Gender: Female

Re: all outward and inward thru 1 IMP plan!

Post by hubbahubba »

SpacePhoenix wrote:Sounds like an extension to the three-frame sort but with the selections used for the three-frame sort being applied to the IMP plan. With all the inward stuff going through one plan then it sounds like all DOs in your area will get their letters walk sequenced and anything letters that either the IMP or walk sequencing machine reject will go straight to manual sorting.
yeah,i think so.At the moment we have 3 CSS machines with another 5 on the way!We are going to walk sequence all the mail for the DO'S in our postcode area at the MC,then deliver them to the DO'S.we currently sequence mail for 4 DO'S,but in the end all the inward will be sequenced,im assuming on this new "super plan" ready for the CSS to walk sort...
same as it ever was...
SpacePhoenix
MAIL CENTRES/PROCESSING
Posts: 12007
Joined: 12 Nov 2008, 17:03
Gender: Male

Re: all outward and inward thru 1 IMP plan!

Post by SpacePhoenix »

Do BT, EH and G areas get any splits? I can't remember offhand if they get splits for the three-frame sort. I know they are the only ones which get splits for outward tracked stuff.
teesdale
MAIL CENTRES/PROCESSING
Posts: 430
Joined: 24 Nov 2007, 16:31

Re: all outward and inward thru 1 IMP plan!

Post by teesdale »

Two more modules of sixteen stackers each were added to take the imp to 192 stackers. Further to walk up and down and really 66 extra boxes as we did some residue bundle boxes before. Outward is one box for one postcode mostly, with some groupings like SY LD TF. Inward is one box to each sequencing batch. There is also a whole imp inward only plan, as not all the batches could be fitted onto the outward/inward plan which includes four secondary sorting plans. Dont know where the savings are supposed to come from in changing to all of this.
hubbahubba
MAIL CENTRES/PROCESSING
Posts: 1045
Joined: 24 Jun 2009, 22:02
Gender: Female

Re: all outward and inward thru 1 IMP plan!

Post by hubbahubba »

SpacePhoenix wrote:Do BT, EH and G areas get any splits? I can't remember offhand if they get splits for the three-frame sort. I know they are the only ones which get splits for outward tracked stuff.
they do at the mo,but after this new plan comes in,we were told only 1 box per postcode!(although i expect they will have to have more than 1 selection for your nearest neighbouring MC'S?
same as it ever was...
whistling dixie
MAIL CENTRES/PROCESSING
Posts: 12
Joined: 16 Oct 2009, 14:35
Gender: Male

Re: all outward and inward thru 1 IMP plan!

Post by whistling dixie »

could some one tell me how many people operate these sequencing machines as we are supposed to be getting them in august and no one has seen fit to inform us about staffing levels etc.thnx
hubbahubba
MAIL CENTRES/PROCESSING
Posts: 1045
Joined: 24 Jun 2009, 22:02
Gender: Female

Re: all outward and inward thru 1 IMP plan!

Post by hubbahubba »

whistling dixie wrote:could some one tell me how many people operate these sequencing machines as we are supposed to be getting them in august and no one has seen fit to inform us about staffing levels etc.thnx
CSS= COMPACT-SEQUENCE-SORTER is run by 1 person,these are the machines that RM are installing in MC and DO's,and i believe these are what you are refering too.
same as it ever was...
24601
Posts: 325
Joined: 14 May 2007, 16:06
Gender: Male

Re: all outward and inward thru 1 IMP plan!

Post by 24601 »

We've had them for 3 years now.While they've kept a handfull of us on a 'night shift' (23.00 - 09.00) being a machine operator is the hardest I've had to work in 23 years !!!!!