in our revision planning meeting today, i was my usual self, slowly,slowly,catchy monkey
i pushed the issue on the inward work flow and iwt
the planners have addmitted from clear down, they expect staff to be tied up and in the van within 45 minutes. they have based a prep rate of 13 items per minute. this includes d2d, kill offs, redirections, etc
the prep rate does not include
tie up, place bags etc in york, collect keys and tabs, specials, distance to loading bay, distance to van, load up xyz bags, oversized parcels, lwt etc, return york and vehicle checks
when questioned on this, the response was they have no authority to chage the paramiters
and they wonder why these revisions are failing, end result was on leaving
i placed the whole revision into a stage 1 disagreement
ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE
ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!
interesting development on planning meeting today
-
keithposty
- Posts: 918
- Joined: 22 Feb 2011, 11:44
- Gender: Male
-
POSTMAN
- SITE ADMINISTRATOR
- Posts: 32779
- Joined: 07 Aug 2006, 03:19
- Gender: Male
Re: interesting development on planning meeting today
I think the 13 mins or similar has been banded about on here before.
But the 45 mins seems way out.
But the 45 mins seems way out.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
-
clashcityrocker
- Posts: 16674
- Joined: 22 Sep 2009, 13:50
- Gender: Male
- Location: strummerville
Re: interesting development on planning meeting today
Do you mean they are expecting you to prep the frames at 13 items/minute and then give you 45 minutes to tie down and load the van?
The way it is written suggests no walk would have more than 585 items to prep and deliver.
The way it is written suggests no walk would have more than 585 items to prep and deliver.
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
-
keithposty
- Posts: 918
- Joined: 22 Feb 2011, 11:44
- Gender: Male
Re: interesting development on planning meeting today
EXACTLY HOW THEY ARE PLANNING IT is the whole indoor elemant from tie down is at 13 items per minute including door to door etc but bagging up etc is not included in the spans