Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
Almighty1
Posts: 75
Joined: 14 Mar 2012, 18:32
Gender: Male

Re: A new bit of equipment for park and loop

Post by Almighty1 »

celerycelery wrote:Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
Quality, get on dragons den with that, secondary use for RM weekly WTLL sessions.. will aid in the reduction of slips, trips and falls by postman coming into contact with the sh*t the management churn out... for our manager i believe we're gonna need to buy those disposable bags in bulk :left:
dvbuk55
EX ROYAL MAIL
Posts: 16650
Joined: 02 Jun 2007, 19:17
Gender: Male

Re: A new bit of equipment for park and loop

Post by dvbuk55 »

Totally unnecessary bit of kit, just sh*t your pants, that's what I do :cuppa
arnold cheshire
Posts: 5309
Joined: 14 Oct 2010, 21:28
Gender: Male
Location: england

Re: A new bit of equipment for park and loop

Post by arnold cheshire »

celerycelery wrote:Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
who speaks to planners ?????????????????
Almighty1
Posts: 75
Joined: 14 Mar 2012, 18:32
Gender: Male

Re: A new bit of equipment for park and loop

Post by Almighty1 »

bringon4dayweeks wrote:
celerycelery wrote:Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
who speaks to planners ?????????????????
typical planner, put in a totally cock-up of a revision, but don't stick around to see if it works just go to the next office to balls that up as well :arrrghhh
justdeno
Posts: 362
Joined: 27 Jan 2012, 16:05
Gender: Female

Re: A new bit of equipment for park and loop

Post by justdeno »

Just had to check the date of the thread, thought it was an April fool :Very Happy We will need a tent, and somewhere to dispose of the bags, don't want the van stinking, that would be a health and safety issue. :shock: The toliets stink enough :sad: :sad:
dvbuk55
EX ROYAL MAIL
Posts: 16650
Joined: 02 Jun 2007, 19:17
Gender: Male

Re: A new bit of equipment for park and loop

Post by dvbuk55 »

justdeno wrote:Just had to check the date of the thread, thought it was an April fool :Very Happy We will need a tent, and somewhere to dispose of the bags, don't want the van stinking, that would be a health and safety issue. :shock: The toliets stink enough :sad: :sad:
just wear a long mac :Very Happy
MT
Posts: 2
Joined: 06 Apr 2012, 21:36
Gender: Male

Re: A new bit of equipment for park and loop

Post by MT »

Almighty1 wrote:
bringon4dayweeks wrote:
celerycelery wrote:Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
who speaks to planners ?????????????????
typical planner, put in a totally cock-up of a revision, but don't stick around to see if it works just go to the next office to balls that up as well :arrrghhh
typical postie, refuses to give any input into the revision then blames the planner when it goes tits up!!!! :Boo hoo!
clashcityrocker
Posts: 16688
Joined: 22 Sep 2009, 13:50
Gender: Male
Location: strummerville

Re: A new bit of equipment for park and loop

Post by clashcityrocker »

MT wrote: typical postie, refuses to give any input into the revision then blames the planner when it goes tits up!!!! :Boo hoo!
If your input is continually ignored because it doesn't fit in with the (savings) agenda of the higher managers then it is understandable the average postie becomes disconnected and disenchanted with the whole revision process.
I'm on my third planner. They all began with a speech about how they were on the side of the delivery postie, how the revision wasn't savings driven and how they didn't care if it upset the DSM but...... :cuppa
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
stokes11eg
EX ROYAL MAIL
Posts: 3077
Joined: 20 Nov 2008, 12:51
Gender: Female

Re: A new bit of equipment for park and loop

Post by stokes11eg »

Almighty1 wrote:
celerycelery wrote:Along with the lwt this is what we will be carrying in our vans for a park and loop revision. All planners agree this will enable them to squeeze a little extra onto all deliveries.
http://www.play.com/Sports-Outdoors/Out ... 482cf2ac32" onclick="window.open(this.href);return false;
Quality, get on dragons den with that, secondary use for RM weekly WTLL sessions.. will aid in the reduction of slips, trips and falls by postman coming into contact with the sh*t the management churn out... for our manager i believe we're gonna need to buy those disposable bags in bulk :left:
:Very Happy If memory serves me well, this was first seen on dragons den!
MT
Posts: 2
Joined: 06 Apr 2012, 21:36
Gender: Male

Re: A new bit of equipment for park and loop

Post by MT »

clashcityrocker wrote:
MT wrote: typical postie, refuses to give any input into the revision then blames the planner when it goes tits up!!!! :Boo hoo!
If your input is continually ignored because it doesn't fit in with the (savings) agenda of the higher managers then it is understandable the average postie becomes disconnected and disenchanted with the whole revision process.
I'm on my third planner. They all began with a speech about how they were on the side of the delivery postie, how the revision wasn't savings driven and how they didn't care if it upset the DSM but...... :cuppa
I got involved with the last revision at my office by giving the planner all the right info about terrain, flat categorisation etc.. After he had put all the correct info into the system the walks came out pretty accurate,I know what you're saying about savings but I've found that the planner has nothing to do with that and that they are there just to do the input into the systems (all the technical stuff) I cant speak for anyone else but the planner that did our revision was ok. He was honest and told us everything that was going on even stuff he knew we weren't going to like. I think its the senior managers that have the savings agendas not the planners. :neutral:
Stormproof
Posts: 6116
Joined: 07 Jul 2007, 21:03
Gender: Female

Re: A new bit of equipment for park and loop

Post by Stormproof »

One of the many planners who f**ked up my office comes in almost every Saturday to do docket and some Sundays when we're really in the s**t. Luckily we've now had loads of part time staff join. Some walks have 4 loops taken off them that proves how much the planners f****d up and that was everyone putting the terrain/flats etc into the computer. Even with some loops taken off each walk a lot still arn't completing. So MT your theory is wrong :cuppa
So keep on moving, moving, moving your feet
Keep on shuf-shuf-shuffling to this ghost dance beat
Just keep on walking down never ending streets


Illegitimi non carborundum
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: A new bit of equipment for park and loop

Post by fishtank »

MT wrote: typical postie, refuses to give any input into the revision then blames the planner when it goes tits up!!!! :Boo hoo!
Although i would always encourage members to try to get involved in the revision process the idea that a lack of staff involvement means that those members do not have the right to turn up to work to a reasonable,stable and manageable workload is nonsense.
Planners are paid to plan,managers are paid to manage and posties are paid to deliver the mail.
Staff involvement should ensure that the fine detail is right,streets run properly,overheads are correct and A+ is up to date but the overall responsibility for creating a working resource model for the office lies with management and planners.
good times, bad times you know I've had my share