ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE

ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!

l/w trolleys and Georoute

Postal workers discussion forum. Discuss the day to day life in a Blue Shirt.
eastie
EX ROYAL MAIL
Posts: 2234
Joined: 16 Jun 2011, 15:32
Gender: Male

l/w trolleys and Georoute

Post by eastie »

Trying to work out why my loops are so slow as 10 minutes slower than Georoute.
1/ round is slowed dramatically when you are pushing a l/w trolley and you have cars parked on pavements
2/ dustbins and recycling bin on paths on emptying days
3/having no clips for bags and bags slipping down and rubbing on wheels
4/having to keep deadwalking back to pick trolley up when you have ,for example 3 houses together
5/keeping trolley secure and in eyeshot
6/no shortcuts
When we 1st started p/l we was told the driver would finish their loop 1st and be able to do packets for the loop but its not working because the driver has about 10 to 12 packets to deliver for the loop and cannot get it done in the 5 minutes extra he has.
This then means he either has to be late for the walkers next bag or he cannot finish his packets and with our loops going along a straight road its impossible for the driver to return as we are getting further away all the time.
The other thing with the later starts is the amount of 739's we are writing out, I end up with bringing half our packets back and are writing out about 20 docket left cards on our busy packet days on wednesdays and thursdays and that is just the walking duty.
wiganpostie
Posts: 670
Joined: 09 Mar 2010, 20:16
Gender: Male

Re: l/w trolleys and Georoute

Post by wiganpostie »

Don't forget acceleration and deceleration of the trolley, as well as that little thing called inertia, none of which RM's planners seem to believe exist - they think that we attain maximum walking speed a millisecond after we put mail through a letterbox. :crazy:
fishtank
Posts: 19732
Joined: 28 Sep 2007, 17:22
Gender: Male

Re: l/w trolleys and Georoute

Post by fishtank »

..because to put it quite simply Georoute is a bag of shite.
I wouldn't trust it to plot my way to the toilet and back.
We had some of the top people in the country to help,we had full involvement from the union,we had full involvement with the duty holders,we had almost 13 months of careful planning....and it still churned out s**t.
They stood around,scratched their heads,tried again....more s**t....tried again...more etc.
s**t in..s**t out they say...you could put diamond into Georoute and you would still get s**t out.
It is as much use at designing delivery rounds as an Etch-a-Sketch. :cuppa
good times, bad times you know I've had my share
AnotherLimey
Posts: 751
Joined: 08 Aug 2009, 18:45
Gender: Male

Re: l/w trolleys and Georoute

Post by AnotherLimey »

fishtank wrote:..because to put it quite simply Georoute is a bag of shite.
I wouldn't trust it to plot my way to the toilet and back.
We had some of the top people in the country to help,we had full involvement from the union,we had full involvement with the duty holders,we had almost 13 months of careful planning....and it still churned out s**t.
They stood around,scratched their heads,tried again....more s**t....tried again...more etc.
s**t in..s**t out they say...you could put diamond into Georoute and you would still get s**t out.
It is as much use at designing delivery rounds as an Etch-a-Sketch. :cuppa
So it's no good then? :wink:
clashcityrocker
Posts: 16688
Joined: 22 Sep 2009, 13:50
Gender: Male
Location: strummerville

Re: l/w trolleys and Georoute

Post by clashcityrocker »

fishtank wrote: It is as much use at designing delivery rounds as an Etch-a-Sketch. :cuppa
That is exactly what our planner brought in to work today.
I assumed he had bought it for one of his kids on the way in.
Now I realise it is for him to use in a professional capacity. :cuppa
Hope he lets me have a go.
The societies of consumption and squandering of material resources are incompatible with the idea of economic growth and a clean planet.
Straight4ward
EX ROYAL MAIL
Posts: 1621
Joined: 25 Oct 2009, 14:32
Gender: Male

Re: l/w trolleys and Georoute

Post by Straight4ward »

fishtank wrote:..because to put it quite simply Georoute is a bag of shite.
I wouldn't trust it to plot my way to the toilet and back.
We had some of the top people in the country to help,we had full involvement from the union,we had full involvement with the duty holders,we had almost 13 months of careful planning....and it still churned out s**t.
They stood around,scratched their heads,tried again....more s**t....tried again...more etc.
s**t in..s**t out they say...you could put diamond into Georoute and you would still get s**t out.
It is as much use at designing delivery rounds as an Etch-a-Sketch. :cuppa
So you're not a fan then? Well I never! :Very Happy
"Never take life seriously. Nobody gets out alive anyway."
krussel
Posts: 5300
Joined: 26 Jan 2009, 18:03
Gender: Male
Location: Out on the streets.

Re: l/w trolleys and Georoute

Post by krussel »

I think Georoute was tried and quickly dropped in other countries :hmmmm RM stick with it as it plans routes which come out on thier side. :roll:
Rows of houses all bearing down on me........I can feel their blue hands touching me.......All these things in all positions.........All these things will one day take control..........
feduppostie
Posts: 947
Joined: 24 Jun 2007, 19:46

Re: l/w trolleys and Georoute

Post by feduppostie »

you lot miss the point!

If they want the rounds done by georoute then get involved and let them

and if the agreement says we use trolleys then use them

if it takes longer so be it

people are so used to making time that when they have to work their hours they think they are hard done by - you are not you are being paid for what you do and protecting jobs at the same time

if your route is too long using a trolley then book or cut off


but do not load up a bag instead and run round to get done you are doing a great diservice to all your workmates

do the job as it should be done - yes youmay have to work all your hours but those hours may well be still there in a years time

run around and they wont
thevardinator
Posts: 165
Joined: 12 Apr 2010, 16:21
Gender: Male

Re: l/w trolleys and Georoute

Post by thevardinator »

I do wonder how I'm supposed to keep the trolley in view when I have to walk up 50-60 zig-zagging steep steps to a house (or 50) surrounded by bushes and so-forth. Obviously they class it as terraced to lower the figures.
STAND TOGETHER IN THE FIGHT.
Brandy
EX ROYAL MAIL
Posts: 729
Joined: 12 Sep 2011, 21:03
Gender: Female

Re: l/w trolleys and Georoute

Post by Brandy »

I wonder how long it will be before these trolleys fall to bits ,not long I expect . Then what wonderful ideas will the plonkers at the top come up with next :roll:
kawoxux
Posts: 300
Joined: 18 Aug 2011, 19:36
Gender: Male

Re: l/w trolleys and Georoute

Post by kawoxux »

Still don't really understand how L/W trolleys are safe in any way. Imagine leaving your shoulderbag on the pavement whilst going up driveways. I think that'd be a conduct matter? I've only used them once and hated it. With a shared van the loops are often so small (say 3 or 4 bundles plus packets) (compared to when I've used pouch boxes or a shop with a shoudlerbag which was very often pushing the limit and i don't doubt sometimes over) they can fit in a shoudlerbag and comfortably be under weight. I've also never been told to use them and none of the people i've ever worked with has used them or even mentioned them, they seem to sit pointlessly in the back of the van. I can see the point if you have a lot of heavy pakcets or a particularly long loop, but they just seem unsafe and unweidly to me.

The HCT seems OK because it actually has a locked box and isn't jsut a bag full of parcels balanced on a pole.