ANNOUNCEMENT : ALL OF ROYAL MAIL'S EMPLOYMENT POLICIES (AGREEMENTS) AT A GLANCE (Updated 2021)... HERE

ANNOUNCEMENT : PLEASE BE AWARE WE ARE NOT ON FACEBOOK AT ALL!

HCT

Postal workers discussion forum. Discuss the day to day life in a Blue Shirt.
Body Beyond Repair
Posts: 327
Joined: 11 Nov 2007, 20:22

HCT

Post by Body Beyond Repair »

Had a meeting with the planner and DOM today,sets out what routes they consider will be achieveable with HCT after a brief disscussion we agree to look at some in more detail within the parameters of agreement,within the hour DSM on the phone C.D.V's no HCT's that's the way to go........a wonder why, no PDA's with HCT's so no tracked, no overweight parcels with HCT's so more parcel duties left in.(CWU) minimal impact into revisions if DSM gets his way of course!!!!.......... the DSM is running the show telling the DOM's whats in and what's out and that's becomming more evident everyday but lucky for me...........the dom said we'll do what's best for the office to maintain full time emplotment(objective) thus creating as many duty sets as possible..........and lucky for him as he was left in no doubt the agreement was getting followed with regards to Delivery methods amongst everything else.Interesting times.......HCT the way to go if terrain fits maximises duties 3.30 hours don't forget (possibly 4 if you don't believe the outputs of Geo Route.......?????? been through it) and gives the odd member the oppurtunity to keep working by himself if he wants.Question everything,Negotiate everything and don't take the planner's word for everything on the agreed tools.........?????????.Remember critisising the system is like critisising the planner himself and he/she will become defensive as its his/her's little baby which they don't like.but you need too.Wrong forum can someone move it to where it's more appropriate.Sorry Knackered!!!!!!!!
BELIAL
Posts: 6758
Joined: 15 Jun 2007, 17:33
Gender: Female
Location: Nowhere

Re: HCT

Post by BELIAL »

Looks like 5hrs delivery for HCT's according to the values input for the walk span indicator :shock:
Bye
Body Beyond Repair
Posts: 327
Joined: 11 Nov 2007, 20:22

Re: HCT

Post by Body Beyond Repair »

Rm seem to be happy with 3.30 max will have another chat and look though.
BELIAL
Posts: 6758
Joined: 15 Jun 2007, 17:33
Gender: Female
Location: Nowhere

Re: HCT

Post by BELIAL »

See span indicator tool posted in downloads by postman :wink:
Bye
pop it in pete
Posts: 351
Joined: 09 Jun 2007, 23:03
Location: lazy town

Re: HCT

Post by pop it in pete »

I was told cvd was the most economical as the vans can be sold off after a few years with less maintenence costs therfore in a short term period its cheaper to have vans then electric hcts?
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: HCT

Post by DGP1 »

pop it in pete wrote:I was told cvd was the most economical as the vans can be sold off after a few years with less maintenence costs therfore in a short term period its cheaper to have vans then electric hcts?
Sold off?? we have CDVs over 6 years old now in my office, they're only replaced if they are totally fubar now.
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
maisymoo04
Posts: 2226
Joined: 07 Apr 2010, 17:11
Gender: Male
Location: You dont want to no

Re: HCT

Post by maisymoo04 »

i have heard a rumour these so called electric trolleys have been f@@@@ off cos they cost more then the bipper van thats waiting to be slung into action(have also heard the bipper van is to small hahah) come on royal mail see rush rush rush profit profit profit you were gettin this before all this s@@@ was gettin wormed in :cfo his fault
"Some day I will have the bottle to take the money"
DGP1
Posts: 15551
Joined: 07 Jun 2007, 20:39
Gender: Male
Location: Terminus

Re: HCT

Post by DGP1 »

maisymoo04 wrote:i have heard a rumour these so called electric trolleys have been f@@@@ off cos they cost more then the bipper van thats waiting to be slung into action(have also heard the bipper van is to small hahah) come on royal mail see rush rush rush profit profit profit you were gettin this before all this s@@@ was gettin wormed in :cfo his fault
The Bippers are about 3/4 the size of a Combo and in my office is only used for the really light deep rural (we all laughed when we heard that they're to be used as van shares).
I'm preparing myself for the zombie invasion, rule number 1 - Cardio
dvbuk55
EX ROYAL MAIL
Posts: 16650
Joined: 02 Jun 2007, 19:17
Gender: Male

Re: HCT

Post by dvbuk55 »

DGP1 wrote:
maisymoo04 wrote:i have heard a rumour these so called electric trolleys have been f@@@@ off cos they cost more then the bipper van thats waiting to be slung into action(have also heard the bipper van is to small hahah) come on royal mail see rush rush rush profit profit profit you were gettin this before all this s@@@ was gettin wormed in :cfo his fault
The Bippers are about 3/4 the size of a Combo and in my office is only used for the really light deep rural (we all laughed when we heard that they're to be used as van shares).
Spot on DGP - when these "minivans" arrived we had to shuffle the fleet about to get the CDV pairs sufficient space to fit everything in. :crazy:
Danelectro
Posts: 1058
Joined: 13 Apr 2008, 01:02

Re: HCT

Post by Danelectro »

Body Beyond Repair wrote:Rm seem to be happy with 3.30 max will have another chat and look though.
We use HCT on 3.5 hrs walks at the moment, the problem they will have on deliveries over that time span is the
HCT dosnt have the capacity to carry that much mail and packets and therefore bags would have to be dropped off
by a support driver but support/packet drivers will no longer exist as their 'plan' is to get rid of these with the CDV.