RM know what 100BSi is and the effort required to maintain that workrate. They are also aware of Relaxation Allowances which need to be assessed and applied on an elemental basis to all PVs (an element is a distinct part of a task that is measurable e.g. Sort Letter to 64BF).Union Man wrote:Are RM confusing a set of standards with the vague application of 100 0/0 effort which is something totally different. I NEED TO KNOW!!!!!!!!!
All PVs should have been measured to an accuracy of +/- 5% with 95% confidence and sufficient study time should have been made by Industrial Engineers (who have passed a rating clinic within the past 6months - to ensure they are proficient).
In outside industry and in the past in mail centres, when values have been questioned by CWU or even management. An extended production study or rated activity sampling exercise has been agreed and undertaken to validate PVs and revisions. RM are unlikely to accept this type of validation for individual units as they no longer have the trained resource and if they did it would cost money they are unwilling to spend plus THEY MAY NOT LIKE THE ANSWERS !