Re: Georoute ran on current routes- rounds coming up small!

Post by fishtank »

I think this thread illustrates exactly what has gone wrong with the revision process.
All of this science,all of this time and all of these resources and even if you tick all the boxes at the end of the day there is a better than even chance the duties will be unworkable and need revisited.
It took 12 months to get our revision off the ground and another 3 months to iron out the wrinkles and at the end of the day i still wasn't 100% happy with it.
I could have done the whole thing myself with a pencil,some blank paper and some decent music in the background in 3 months and probably made the savings they originally wanted...and never got.
I know the planners love the science,it makes them feel important,i'm not sure what some reps get out of it though.
good times, bad times you know I've had my share
cinemasaint
Posts: 132
Joined: 05 Oct 2011, 21:00
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by cinemasaint »

mandelsons_toenail wrote:Rounds would only be tested wed-fri and packet counts were done over 6 weeks.

I would also ensure it matched model week

I know for a fact our packet counts were fudged
Patrick Clifton
Posts: 430
Joined: 16 May 2010, 12:37
Gender: Male
Location: Greendale

Re: Georoute ran on current routes- rounds coming up small!

Post by Patrick Clifton »

ninja wrote:Here is some of the info and depends if you are using PDA's.
ATTENDACE CALL TIMES.
(These times are shown here for information only and are included in the ‘Calling Time’ parameters.)
seconds
2.3
Successful attendance call – packet
25.6
2.4
Successful attendance call – signature on card
58.6
2.5
Successful attendance call – signature on PDA
52.9
2.6
Successful attendance call – PDA no signature
37.0
2.7
Unsuccessful attendance call - packet
60.4
2.8
Unsuccessful attendance call – signature on card
78.4
2.9
Unsuccessful attendance call - PDA
78.3
So are these times from when you enter the gate of the DP?
drb
Posts: 1044
Joined: 30 Jan 2007, 21:44
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by drb »

Excellent work Ninja!
ninja
Posts: 193
Joined: 08 Sep 2010, 20:16
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by ninja »

Several points to consider:

Testing of the duty set is done during phase 5/6 and has built in reviews at weeks 4,8,12 in order to fix any problems. The planners should have provided a daily record sheet per duty that can be used to break down the daily activities and then used to compare against the tools (IWT,GEO,etc).

The PDA's are a real problem and your correct that any delays using them wouldn't have been planned for within the tools. Although I'm aware that OFCOM has been sending there own industrial engineers into mail centres/delivery units to take there own measurements.
ninja
Posts: 193
Joined: 08 Sep 2010, 20:16
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by ninja »

Patrick these values are from standing at the door, so added to this value would be moving from DP to DP and roughly 8sec for delivery of mail.

As stated within various forums it would be a lot simpler for the planners to indicate the required hours needed to run the unit and then once agreed do a table top with good old pen and paper.
Ultimately this is all what the planners are doing within the tools without the knowledge of the staff who do it on a day to day basis.
Patrick Clifton
Posts: 430
Joined: 16 May 2010, 12:37
Gender: Male
Location: Greendale

Re: Georoute ran on current routes- rounds coming up small!

Post by Patrick Clifton »

ninja wrote:Patrick these values are from standing at the door, so added to this value would be moving from DP to DP and roughly 8sec for delivery of mail.

As stated within various forums it would be a lot simpler for the planners to indicate the required hours needed to run the unit and then once agreed do a table top with good old pen and paper.
Ultimately this is all what the planners are doing within the tools without the knowledge of the staff who do it on a day to day basis.
Thanks for clarifying that :Very Happy

78 seconds is not long for the initial knock, waiting, 2nd knock & when I would begin writing the 739 out tho :so there

At the WTL session today, the video included some office that 'fixed' issues of packets by giving people more time to answer...
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32819
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by POSTMAN »

:funneh
ATTENDACE CALL TIMES...
:cuppa
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.
mandelsons_toenail
Posts: 1294
Joined: 08 Aug 2009, 18:16
Gender: Male
Location: Outer Hebrides

Re: Georoute ran on current routes- rounds coming up small!

Post by mandelsons_toenail »

I have the Pegasus parameters document that people may find useful.

This gives all above mentioned times and also gives times for delivering from vans etc.

http://www.royalmailchat.co.uk/communit ... hp?id=6922" onclick="window.open(this.href);return false;
ninja
Posts: 193
Joined: 08 Sep 2010, 20:16
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by ninja »

Also remember that your road network maintance tool (within APLUS) must be correct and have the right speeds allocated to the roads, I:E 20MPH speed limits around schools,etc....
Georoute will reference from the APLUS road network tab and so if the speeds are not showing then the 30MPH default will be applied by the tools.
eastie
EX ROYAL MAIL
Posts: 2234
Joined: 16 Jun 2011, 15:32
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by eastie »

How long dogive you for when the old woman can't find her keys? :left:
User avatar
POSTMAN
SITE ADMINISTRATOR
Posts: 32819
Joined: 07 Aug 2006, 03:19
Gender: Male

Re: Georoute ran on current routes- rounds coming up small!

Post by POSTMAN »

ninja wrote:Also remember that your road network maintance tool (within APLUS) must be correct and have the right speeds allocated to the roads, I:E 20MPH speed limits around schools,etc....
Georoute will reference from the APLUS road network tab and so if the speeds are not showing then the 30MPH default will be applied by the tools.
I would reckon a lot of peeps would miss out on that,i have loads of 20mph round my way.
I Wrote-During Covid-Which is still relevant now
It's good to get these types of threads, the ridiculous my manager said bollox, so we can reassure ourselves that while the world is falling apart, Royal Mail managers are still being the low-life C***S they have always been.
My BFF Clash
The daily grind of having to argue your case with an intellectual pigmy of a line manager is physically and emotionally draining.