Back to my own DO today since joining RM, after less than 2 weeks on a "familar" walk / weeks off sick / rehab at another DO / spare at a 3rd DO / enforced annual leave. Checked earlier in the week what (inevitably new) walk I was assigned to so I could get a proper map, get my bearings, etc. beforehand. Prepped there for a bit then was inexplicably moved to another walk I've never done (which also, by the way, had hardly been prepped at all).
Long story short, I told Line Manager it was unlikely I'd get it completed, was told that wasn't an option. Asked if overtime'd be paid then, to be told "how long's it going to take ?"
What should I have done, and is there something in the Union agreement about cutting off that I can quote in my resignation letter ?